The retention of agricultural storage shed and all associated works on existing farmyard
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Tullowphelim , Tullow , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 254 nearby planning records within 5 km where a location match is available.
- Matched source
- 22195
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Demolition of an existing front porch, an extension to the side and rear of an existing cottage, upgrade of sewage treatment system, including all associated site and landscaping works
For the demolition of 2 No. incomplete houses as granted under Reg. Ref. No. 07/1136, and the proposed planning for the construction of 35 No. houses which consist of 8 No. house type A (3 bed end of terrace), 11 No. house type B (2 bed mid terrace), 7 No. house type C (3 bed semi detached), 1 No. house type C1 (3 bed semi detached unit with gable treatment) and 8 No. house type D (2 bed semi detached), accessed from the existing Park Gate estate vehicular and pedestrian entrance. All with associated site works, drainage and landscaping.
For the construction of a domestic garage, and all associated site works
For as constructed two storey four No. apartment block (previously granted for 5 No. apartments under PL Ref 15/93), retention for external alterations to windows and doors, alterations to external stairwells, minor external site alterations and all associated site works
Single Storey Extension to Side of Existing Dweling and associated site works
Source match
Matched from public planning record 22195The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report