For the erection of 2 no. fully enclosed fuel storage tanks proposed for the refuelling of the Applicant's internal transport fleet. Each tank will have an outer bund which has in excess of 110% of tank capacity and will be sited upon a Concrete Apron with a Class 1 Full Retention Oil Interceptor. Significant further information and revised plans have been submitted.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands c.450m to North West ofBallyconnell Cement Works , Ballyconnell , Co Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 138 nearby planning records within 5 km where a location match is available.
- Matched source
- 2227
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the development of a battery energy storage system (BESS) within a total site area of up to 0.62 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 15 no. electrical inverter/transformer station modules (SKIDS), 10 no. containerised battery storage modules on concrete support structures, 20 no. heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, culvert, landscaping works and all associated ancillary infrastructure on land
To apply for thirty-year permission for a grid system services facility located at Gortawee, Mucklagh, Ballyconnell, County Cavan, over an area of c.3.46 hectares. The proposed works shall consist of the installation and operation of energy storage units, including 1no. customer switchgear containers and compound, which will be connected to the national grid via the adjacent Gortawee 110kV substation infrastructure, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land
To construct 1 No. Poultry House together with all ancillary structures and all associated site works arising from the above proposed development. Significant further information and revised plans have been submitted
For development consisting of alterations, extension and change of use to Slieve Rushen House to form a Heritage and Ecological Visitor Centre, including toilet facilities, café, information display etc and meeting rooms and 1 no. self catering apartment with associated improvements and upgrade to the existing vehicular access and provision of new car-parking, picnic area and play-park and connection to the public sewer
For the proposed installation of an on-site truck wash and wash bay equipment store to the north of the existing warehouse with washwater recovery system and associated drainage, underground tanks and ancillary site works
Source match
Matched from public planning record 2227The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report