Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 88 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the following(1) demolition of existing flat roof extension to the rear of existing dwelling house (2) construction of a new front porch and new extensions to both gables ends and the rear of existing dwelling house, (3) carry out all necessary alterations and refurbishment works to existing dwelling house - including the raising of existing eaves and ridge level (4) to install new effluent treatment system and percolation area together with the carrying out of all associated ancillary site works
(1) Demolish existing gable end flat roof annex; (2) construct new extension to gable end of existing dwelling house; (3) carry out all necessary alterations and refurbishment works to existing dwelling house; (4) construct new domestic garage; (5) relocate existing vehicular entrance; (6) upgrade existing septic tank with the installation of new effluent treatment system and percolation area together with the carrying out of all associated ancillary site works
Retention for the existing 19.6m2 lean-to shed
For development consisting of the construction of a new slatted/dry shed with attached manure pit together with all ancillary site works and services
A. renovation and extension of the existing dwelling, b. installation of new wastewater treatment system & percolation area, c. installation of a new, replacement well for domestic use, d. installation of a new garage/workshop for domestic use, e. retention of the existing vehicular access, modification of the existing lane way within the site boundaries and associated landscaping works, f. all associated site works
PP - development comprising of the following: a) The conversion of existing garage to domestic accommodation, And all associated site works and service connections.
The brief summarizes the pattern across all 88 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2229The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief