The construction of a portal frame storage unit with the installation of solar photovoltaic panels mounted to roof of same, with all associated ancillary site development works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Muinebheag Business Park , Royal Oak Road , Bagenalstown
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 298 nearby planning records within 5 km where a location match is available.
- Matched source
- 22320
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The provision of internal first floor office space including the addition of first floor windows to the north and west elevations and all associated ancillary works
For 1.8m wide pedestrian access from public footpath and all associated ancillary works
An extension to existing building consisting of extending existing locker room and new goods inwards/storage area at ground floor level and extending existing office area at first floor level, together with all associated site works.
The development will consist of a new Wastewater Pumping Station, two new kiosks (kiosk one 3.6m x 0.8m and kiosk two 2m x 1.8m, each 1.8m high), a new 50m3 below-ground storage tank, ground mounted solar PV array (30m2 total), new palisade perimeter fencing and gate (each 2.4m high), all on a site of 0.04 ha; the widening of the existing access road and the existing access to the R724, associated demolition of existing boundary wall and gate; a new 100mm diameter rising main (360m) and 225mm gravity sewer (190m) on the R724 between the proposed pumping station and Royal Oak Road; and all ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works
Source match
Matched from public planning record 22320The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report