For the erection of extensions to the rear and side of an existing two storey dwelling house and all associated site works Significant further information and revised plans have been submitted.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Aughnadrumgowna Caulfield , Tullyco , Cootehill Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 150 nearby planning records within 5 km where a location match is available.
- Matched source
- 22426
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the erection of a dwelling house with entrance gates and piers, waste water treatment system and percolation area and all associated site works
For the erection of a single storey dwelling house, detached domestic garage, entrance gates and piers, waste water treatment system with percolation area and all associated site works
To RETAIN and continue with alterations to previously approved planning permission for a single storey dwelling house, Planning Ref: 22/519. Alterations include an increase to the floor area of the dwelling, elevational changes and amendments to the site layout plan.
To erect 1,024 sqm (150 KVA) of solar photovoltaic (PV) panels on ground mounted frames/supports c. 2.5m high & all associated works
To construct a new part two-storey dwelling & part single story dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
Source match
Matched from public planning record 22426The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report