The removal of the existing acoustic & dust screen, which consist of stacked shipping containers with mesh netting on top to allow for the erection of an extension to an existing permitted materials recovery facility. The extension is located to the western elevation of the existing building, which has a gross floor area of 1,006 sqm. The maximum height of the western extension is 10.25 metres with all associated site development works above and below ground. The development relates to a waste material recovery site which is operated under a Waste Licence granted by the EPA
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Fassaroe , Bray , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
19% of nearby decided applications were refused. The preview found 2,129 nearby planning records within 5 km where a location match is available.
- Matched source
- 22659
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Single storey waste materials recovery building to internally accommodate existing on site external waste management activities. The proposed building will be located to the north western corner of an existing operational yard area and will include inter alia external finishes to match the existing buildings on site, ramp access and egress to an internal recessed loading bay, ventilation systems, alterations as necessary to all ancillary site works and services. The proposed works will also include the installation of photovoltaic panels to the south facing roof of the proposed waste materials recovery building and also to the roof of the existing main commercial and industrial waste transfer building, combined with alterations as necessary to associated site works and services. The development relates to a waste material recovery site which is operated under a Waste Licence granted by the Environmental Protection Agency
Removal of existing materials and works on site and the erection of 1. no. storage shed with a GFA of c. 1,222 sq.m. with a maximum height of c. 12.2 metres, located to the south of the existing sorting unit on site, and all other associated site development and landscape works. The building will be finished in concrete, and vertical cladding to the walls and roof. The development relates to an existing waste material recovery site which is operated under a Waste Licence granted by the Environmental Protection Agency
Erection of three separate acoustic and dust screen structures associated with an existing permitted materials recovery facility and all other associated site development works above and below ground. The three structures are located to the western side of the existing centrally located Screening / Sorting building. Structure A is located a minimum of c. 36m from the western boundary, it covers an area of c. 121.2sqm and has an overall height of c.12.26m. Structure B is located a minimum of c. 67m from the western boundary, it covers an area of c. 166.7sqm and has an overall height of c. 8.347. Structure C is located c. 94m from the western boundary, it covers an area of 136.2sqm and has an overall height of 10.91m. The structures include stacked shipping containers with mesh netting on top and have been erected to provide acoustic and dust screening for the ongoing activity of the materials recovery facility including waste wood processing and metals separation. The development relates to a waste material recovery site which is operated under a Waste Licence granted by the Environmental Protection Agency
Erection of three separate extensions to an existing permitted materials recovery facility and all other associated site development works above and below ground. The extensions are to the western, southern and eastern elevations. The western extension has a gross floor area of c. 7826sqm and was constructed to enclose and weather protect plant associated with the permitted materials recovery facility. The extension also encloses the permitted wood shredding activity on site. The maximum height of the western extension is c 10.25 metres. The southern extension has a gross floor area of c. 194sqm and was constructed to enclose and weather protect the loading of vehicles. The maximum height of the southern extension is 1. 10.25m. The eastern extension has a gross floor area of c. 496.7sqm and was constructed to enclose and weather protect plant associated with the permitted materials recovery facility. The maximum height of the eastern extension is c. 8 metres. The development relates to a waster material recovery site which is operated under a Waste Licence graned by the EPA
Proposed two storey pitched roof extension to side of existing building and single storey flat roof infill extension and flat roof dormer to rear. Modifications to front elevation to include pitched roof dormer and front door overhanging detail along with associated internal modifications and siteworks
Source match
Matched from public planning record 22659The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report