Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Block G Corlurgan Business Park , Corlurgan , Cavan

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

5% of nearby decided applications were refused. The preview found 586 nearby planning records within 5 km where a location match is available.

Matched source
23114
Project type
One-off house
Coverage
5 km radius
586Nearby applications
5%Refused
556Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

23114

For the construction of a Training Centre to new Block G. Works include associated site development works, connection to existing site services and effluent treatment plant and percolation area/polishing filter

Granted0.0 km15 June 2023
20384

Is sought for alteration and extension to rear of Block C. Works include associated site development works and replacement of existing effluent treatment plant and percolation area in accordance with conditions on Planning Permission Ref 20/186

Granted0.0 km21 October 2020
19171

To retain and continue with alterations to elevations and construction of loading bay to Block F (Previous Planning Ref 09/162). Works include construction of extension and ramp to side of unit for loading bay, alterations to first floor mezzanine and associated site development works

Granted0.0 km13 September 2019
20186

For alteration and extension to Block F. Works include replacement of existing effluent treatment plant, replacement of existing percolation area with a new polishing filter in accordance with EPA guidelines, installation of pumping main to new polishing filter located to adjoining lands and associated site development works

Granted0.0 km09 July 2020
2460530

For Demolition of the existing buildings on the site (1,430sq.m) and closure of the existing entrance onto the N55. Construction of a new filling station consisting of: Single storey Service Station Building (957sq.m) measuring predominantly 6.24m high, with a maximum of 8.4m high. It will contain a net retail area of 100sq.m (including ancillary off-licence measuring 10sq.m), 2 no. communal seating areas, 4 no. food/beverage offers, drive-thru facility (hatch and lane), back of house (including toilets, office, staff services and storage) and detached service yard. 4 no. pump islands under a canopy measuring maximum of 5.55m high (with parking for 8 cars). 51 no. car park spaces (with additional spaces as follows: 5 no. EV charging spaces, 3 no. service bays, 4 disabled spaces, 3 drive-thru waiting bays and 6 staff spaces). 10 no. HGV/bus parking spaces. 2 no. car wash bays. 2 no. HGV fueling bays (maximum height of canopy 6.2m high). 10 no. cycle parking spaces. All associated site works including, landscaping, boundary treatment, substation, circulation, lighting, fill points, underground fuel tanks and signage (free standing and on structures). For clarity vehicular access/egress will be from the existing roundabout junction at the north end. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.

Granted0.2 km24 June 2025
2517

To remove the existing hay shed and replace it with an agricultural shed which will consist of slatted area with slurry holding tank underneath, cubicles and calving pens. Also construct an underground slurry holding tank and all associated site works

Granted0.4 km25 July 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required