To construct storey & a half extension to rear of existing dwelling together with alterations to floor plans/elevations to include changing existing roof profile to include gable ends & demolition of existing extension to rear, RETENTION permission for window to south elevation, use existing entrance, decommission existing septic tank and install effluent treatment system, percolation area and associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Killymoriarty , Ballyconnell , Co Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 92 nearby planning records within 5 km where a location match is available.
- Matched source
- 2350
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct an extension to the side and rear of existing dwelling, upgrade existing septic tank system and connect to all existing associated services
To demolish existing habitable two storey dwelling and erect a fully service two storey dwelling complete with amendments to existing entrance, new boundary walls and piers, new waste water treatment facilities, detached domestic garage, and all ancillary works
To demolish existing dwelling and workshop
(a) demolish existing cottage and extension to rear (b) decommission existing septic tank (c) carry out development works to reinstate the site to a green field
To (A) Demolish semi-detached cottage, extension to rear and detached garage, (B) decommission septic tank (C) carry out development works to reinstate the site to a green field
Source match
Matched from public planning record 2350The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report