A new first floor front and side extension over existing ground floor together with infilling existing porch area at ground floor and all associated ancillary site works and connection to services
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
87 Seacrest , Bray , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,889 nearby planning records within 5 km where a location match is available.
- Matched source
- 23530
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The demolition of existing 7.5sqm sunroom and construction of a 50.4sqm flat roof rear extension to existing dwelling and associated works
Demolition of existing 7.5 sqm sunroom and construction of a 38.6 sqm flat roof rear extension to existing dwelling, 18.1 sqm side extension on the first floor over the existing ground floor to existing dwelling and associate works
(1) new single storey extension to existing detached garage for use as Art/Hobby Room to rear of existing main house for ancillary use of the home. (2) Conversion of existing detached garage to new Home Office and Gym to rear of existing main house for ancillary use of the home. (3) all above with associated site works
Roof space conversion together with rear extension and also widened vehicular entrance and wish connection to all services and associated site works
Existing dwelling and outbuildings as constructed. Permission for the demolition of 2 no garden sheds, conversion of attic to habitable accommodation, dormer window to the rear and new skylights to the front and rear, together with associated site works
Source match
Matched from public planning record 23530The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report