For the proposed installation of an on-site truck wash and wash bay equipment store to the north of the existing warehouse with washwater recovery system and associated drainage, underground tanks and ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Gortawee or Scotchtown & Rakeelan Td , Ballyconnell , Co. Cavan.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 143 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360188
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For: the surfacing of the existing hardstanding gravel areas to the north and west of the existing distribution facility, the provision of a designated parking area for HGVs and a staff car park in these areas together with all associated ancillary site works
For development consisting of alterations, extension and change of use to Slieve Rushen House to form a Heritage and Ecological Visitor Centre, including toilet facilities, café, information display etc and meeting rooms and 1 no. self catering apartment with associated improvements and upgrade to the existing vehicular access and provision of new car-parking, picnic area and play-park and connection to the public sewer
For the erection of extensions to the left & right sides of the existing building comprising of store, loading area, workshop, offices & staff area. Works to also include alterations to elevations and internal layout & associated site works
To deposit excavated material from the proposed development, the subject of planning permission PL 16/485 at Ballytherm Ltd. on their site at Rakeelan, Ballyconnell, Co. Cavan as a prerequisite of further development. Significant further information and revised plans have been submitted
- RED III - for a solar energy development comprising ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, underground cabling, temporary construction compound, erection of Transformer station (11kV), laying of a permeable gravel access track, widening of existing site (field) entrance, relocation of the existing ESB overhead line, erection of CCTV poles and cameras, erection of an entrance gate, artificial berm, landscaping and biodiversity measures all associated ancillary development works, for the purpose of generation renewable energy electricity. Planning Permission is sought for 35-year operation of the solar farm following which the site will be decommissioned, all development removed and the Site restored to agricultural lands
Source match
Matched from public planning record 2360188The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report