The construction of a standalone building to the rear of our existing premises to be used in conjunction with our existing community centre as a counseling/training hub, connection to services, associated parking and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Askea House , Pollerton Rd , Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 687 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360305
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
No1. retention permission for alterations to previously granted planning application (PD4006) to include the construction of a second floor dormer style extension, 8 no. velux roof windows, internal alterations, and all associated site works, No.2 permission for the change of use of the afore mentioned building from, previously granted retail & office space to use as community centre offices and all associated site works
Permission for the construction of a single storey extension to the front of elevation of my existing dwelling and all associated site works.
For the installation of a prefabricated building on site to be used as a kitchen to serve lunches to our students under the schools meal scheme, connection to services and all associated site works
New full size astro pitch, flood lighting, sports fencing, ball stop netting and all associated site works
The development will consist of alterations to granted planning application 2360298 which include a change to roof profile in proposed extension and alterations to brickwork cladding
Source match
Matched from public planning record 2360305The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report