Of PRR 17/908 and PRR 21/1237
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Blessington , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 320 nearby planning records within 5 km where a location match is available.
- Matched source
- 23690
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Amend the design of the approved development (Planning Reference 17/908) which comprises consent for a Solar PV Energy Development. Proposed amendments include (1) Project lifetime proposed to be extended from 30 years to 35 years (2) Substation to increase in size (3)Change in height and angle of solar panels (4) Transformer containers to increase in size (5) Removal of the customer substation (6) Deer fencing to increase in size (7) MW output to be increased from 10.8 to 15MW to align with existing grid connection offer (8) Slight alteration to the access tracks and (9) Number of CCTV cameras to reduce
Solar PV panel array comprising photovoltaic panels on ground mounted frames within a site area of 21.04 ha, 8 no single storey MV substations, 1 no single storey DSO substation, 1 no single storey customer substation with 1 no communications pole attached, 1 no single storey spares building, boundary securing fencing and access gates, CCTV, associated electrical cabling and ducting, upgraded and new access tracks and all associated ancillary development and landscaping works. The planning application includes a Natura Impact Statement
Permission for a period of 10 years to construct and complete a solar PV energy development and grid route, with a total site area of 28 hectares comprising of the construction of PV panels mounted on metal frames, transformer stations, new access tracks, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, 20 kV underground cabling connecting the solar farm to the existing Blessington 38kV ESB Substation, and all ancillary grid infrastructure and associated works. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of the application for planning permission
Construction of two storey dwelling with a treatment plant, soil polishing filter and a new entrance along with all associated site works
Two storey dwelling with garage, oakstown treatment plant with soil polishing filter and widening of existing access laneway and all associated site work
Source match
Matched from public planning record 23690The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report