(Reference No P24/75), to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Caherea , Lissycasey , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 217 nearby planning records within 5 km where a location match is available.
- Matched source
- 24275
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a garage along with ancillary site works
For alterations to the parking / set down area including adjustments to the front wall along with all necessary ancillary works
To a) RETAIN modifications to dwellinghouse, b) RETAIN private garage to rear of dwellinghouse c) RETAIN site boundaries / site layout as constructed and d) decommission existing septic tank and install new waste water treatment unit / raised polishing filter along with all associated site works original planning reference nos p8/7098 and P8/11773
To a) RETAIN modifications / extension to dwellinghouse b) RETAIN private garage to side of dwellinghouse c) RETAIN private shed to rear of dwellinghouse d) RETAIN site boundaries / site layout as constructed and e) decommission existing septic tank and install new waste water treatment unit/ raised polishing filter along with all associated site works original planning reference nos P8/4370 and P8/20063
Source match
Matched from public planning record 24275The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report