Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

ESB Telecoms Ltd Compound , ESB Arklow 220KV Substation , Killiniskyduff Dublin Road

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 572 nearby planning records within 5 km where a location match is available.

Matched source
24289
Project type
One-off house
Coverage
5 km radius
572Nearby applications
14%Refused
494Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

24289

The installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of c.46 sq.m., to a maximum height of 4.6 metres above ground level). Works to consist of all ancillary development works, including steel uprights at

Granted0.0 km19 August 2024
22433

The installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Substation and the permitted Pollahoney GIS substation, (WCC reg ref 20/1285). All associate and ancillary site development, remedial and construction works will be concentrated along the public road network, i.e. R772, L2180, L6179-0 and L-61791-0 to facilitate the underground cabling infrastructure within the townlands of Killinskyduff, Tiknock, Kilbride and Shelton Abbey. The application will include an Environmental Impact Assessment Screening Report (EIA)

Granted0.0 km16 June 2022
2381

New vehicular entrance onto R772/Old N11 and all associated site works

Granted0.1 km23 March 2023
18340

Advertisement structure

Refused0.1 km18 May 2018
19668

Solar farm, comprising groups of solar photovoltaic panels erected on steel frames, an inverter and transformer housing unit, a substation building and ancillary site services and works, including underground ducts and cables, fencing, entrance gateway and site access roadway, on a site having an area of 0.86 hectares. Permission is sought for a period of ten years

Refused0.2 km14 August 2019
21837

Extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store

Granted0.4 km19 August 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required