Section 42(1) on PRR 10/2123 (access road from the south western roundabout of the Ballyronan interchange to the site entrance. The road continues northward for an additional c 0.3km terminating in a cul de sac formed by bollards at its junction with the laneway located at the northern site boundaries (total road length c 1.1km). The proposed road will include a two way cycle track and a footpath and will involve restoration / modification of the existing Demesne wall; closure of the existing left in / left out access to Mountkennedy House (protected structure) off the N.11. Access will be provided to the existing laneway directly from the proposed access road, 10 no identical two storey Data Centre units each measuring c 10,915 sqm gross. The ground floor of each unit comprises plant areas, storage, workshops, reception / lobby, office space, inspection area, breakroom, internal loading areas and circulation space. The first floor of each unit comprises a net technical area, offices, ancillary plant, storage and circulation space. Each Data Centre unit will also have an ancillary service yard that will incorporate a sprinkler tank, a pump house, an MV switchroom, ESB switch rooms, electrical transformers enclosed within a post and wire mesh fence and a fuel storage tank, an auxillary cooling compound located to thee rear of each building and adjacent to the service yard, an enclosed electrical compound located centrally along the southern site boundary providing for a future step down transformer from the existing 220/110kv overhead power line, a primary dry cooling compound in area housing dry cooling units located to the west of the site; 3 no heat exchanger buildings located on site at the south west corner, north west corner and to the south of the site entrance at the eastern boundary, 250 car parking spaces including 40 electric car parking spaces and 20 disabled car parking spaces; a temporary waste water treatment plant and percolation area located centrally within the site; 1 main security hut located at the site entrance and 10 individual security huts located at the entrance to each individual Data Centre unit; landscape berming and additional planting at the site boundaries; all ancillary site developments works. The proposed development comprises or is for the purposes of an activity that may require an Integrated Pollution Prevention Control Licence and has a total gross floor area of 111,228 sqm)
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Mountkennedy Demesne & Tinnapark Demesne , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,445 nearby planning records within 5 km where a location match is available.
- Matched source
- 24306
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Single storey extension at front & rear, 2 storey extension to side incorporating an existing single storey extension, raise existing front boundary wall from 1.28 metres high to 2.185 high
Single storey ground floor extension to front also single and two storey extension to rear incorporating family room and living room at ground floor to front and wc and utility room at ground floor to rear also bedroom and bathroom at 1st floor to rear
Dwelling, garage and associated site works
2 bedroom dormer bungalow (141 sqm), connection to mains water, installation of wastewater treatment system, all necessary site works to facilitate the development
The construction of 2 No., four bedroom dwelling houses of 202 sqm each, with associated site, drainage and landscape works to include new driveway entrances for each dwelling, with the demolition of the existing sheds and stables buildings to facilitate the works
Source match
Matched from public planning record 24306The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report