Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Bray Methodist Church , Eglinton and Florence Road , Bray

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

19% of nearby decided applications were refused. The preview found 1,962 nearby planning records within 5 km where a location match is available.

Matched source
24486
Project type
One-off house
Coverage
5 km radius
1,962Nearby applications
19%Refused
1,597Conditional grants
2Refusal reasons

Top refusal reasons nearby

Other1
Zoning Contravention1

Nearest similar decisions

24486

Construction of an external play area (254sqm) together with all necessary site works including perimeter fencing, access gates and an all-weather play surface. Bray Methodist Church is a protected structure

Granted0.0 km11 February 2025
18660

Hoarding/fencing

Granted0.0 km25 July 2018
23687

The demolition of an existing single storey building (74sqm.) and its replacement with a two storey multipurpose sports and recreation building (295sqm.) together with all necessary site works

Granted0.0 km18 December 2023
181075

Removal of most of the pews and their replacement with loose seating and the creation of a new doorway in the internal lobby wall. This is a protected structure

Granted0.0 km29 May 2019
2360253

1. Change of use from Commercial to residential. 2. All necessary ancillary works to facilitate this development

Granted0.0 km23 October 2023
171272

Building as constructed and all associated site works

Granted0.0 km30 May 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required