The phased construction consisting of Phase 1A) the felling and removal of the existing car park trees, Phase 1B) The demolition of the existing single storey derelict house and the temporary relocation of the existing 50 space car park off site to the rear of Byrnes funeral directors on Railway Road and the temporary relocation of the existing single storey Portacabin beside the existing Gym building. Phase 2) The construction of the three storey school building of 8308 sqm gross internal area, consisting of general classrooms, locker areas, specialist classrooms, multi-purpose hall and associated fitness room, changing & storage facilities, a general purpose hall with an associated dining area and servery, library, a 4 class base Special Educational Needs (SEN) Unit and associated sensory garden, technology, construction studies & associated prep room, graphics, engineering, art, science and home economics classrooms, including ancillary stores, service areas, staff and administrative accommodation. The proposed school will include the provision of Heat Pumps with PV panel installations located on the new school roof. The provision of a new boundary wall, vehicular entrance & pedestrian access gate and associated set down area to the Old Dublin Road. Phase 3) The demolition of the remaining 2 storey gym and main school buildings including the 2 no single storey Portacabins and the construction of a new avenue, a new boundary wall, pedestrian entrance, and emergency vehicle access to Railway Road and 2 no new ball courts. 58 car parking spaces are proposed including 3 new universal design parking spaces, 150 bicycle spaces, biodiverse water management and attenuation systems, hard and soft landscaped areas, upgrading & refurbishment of existing boundaries, some new boundary walls, external store and ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St Marys Academy CBS , Railway Rd , Rathnapish
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 666 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460006
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for Retention and completion of temporary car park at Old Dublin Road, Carlow. Works shall include revisions to the exiting entrance and entrance walls, site fencing and all associated site works.
Construction of single storey temporary accomodation to consist of 3 classrooms and a toilet block and all associated site works.
Demolition of 2no. Derelict dwellings at Old Dublin Road, Carlow, in order to provide additional playground space. Works shall also include revisions to the existing entrances and entrance walls, along with provision of school car parking, site fencing and all other associated site works.
Alterations to previously approved development Reg. Ref. 17/228 comprising of the inclusion of a roof canopy to the new accessible passenger footbridge and 2 no. stairs, between the existing platforms. Carlow Railway Station is a protected structure.
Permission for development for a single storey extension and alterations to the Sacred Heart Ward to accommodate 2 no. single en-suite bedrooms, sitting / dining space, pantry, assisted wc and all ancillary site works
Source match
Matched from public planning record 2460006The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table