Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 455 decisions within 5 km, 5 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The development will consist of: (i) A new two storey school building standalone extension, incorporating Classrooms, Specialist Teaching spaces, Special Education Needs Unit, Offices and Ancillary accommodation. Services to include roof mounted photovoltaic panels & plant room. (ii) An external heat pump and gas tank compound and a standalone substation building. (iii) Adjustments to the existing vehicular and pedestrian site entrance gates onto Bóthar Buí road and on-site set down improvements, new internal access roadways, increase of on-site car parking including a covered bicycle stand, site lighting, and all ancillary site works, including temporary construction site access route off the Knockanes Road
Erection of 2 no. temporary portacabins with no new connections to existing services
Construction of a two storey dwelling house, combined vehicular entrance with proposed dwelling to the South, with connection to public sewer and all public utilities with all associated site works
Construction of a two storey dwelling house, combined vehicular entrance with proposed dwelling to the North, with connection to public sewer and all public utilities with all associated site works
Extension of Permission for Planning Ref. 14/941: the construction of dwelling house, front boundary walls, entrance, together with all associated site works
Demolition of existing derelict bungalow and domestic garage and to build a new bungalow and domestic garage, front entrance gate and wall and connections to all existing services
The brief summarizes the pattern across all 455 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief