Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Tinnaclash , Kiltegan , Co. Carlow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 173 nearby planning records within 5 km where a location match is available.

Matched source
2460279
Project type
One-off house
Coverage
5 km radius
173Nearby applications
10%Refused
156Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2460279

The construction of a dwelling house and garage, waste-water treatment system, water bore well, alterations to the existing site entrance, boundary treatments and all associated landscaping and ancillary site works

Granted0.0 km02 April 2025
21334

Permission for (1) the restoration of a 6.1 hectare abandoned sand and gravel quarry to agricultural grassland, by backfilling, using imported inert soil and stone; and (2) temporary ancillary development including (a) 1 no. site office; (b) 1 no. portable toilet; (c) 1 no. wheelwash and (d) improvement works to the site entrance, access gates and access road and internal access tracks. A Natural Impact Statement will be submitted to the planning authority with the application.

Refused0.5 km28 October 2021
18444

For 1) the restoration of a 6.17 hectare abandoned sand and gravel quarry to agricultural grassland, by backfilling, using imported inert soil and stone; 2) the construction of a blockwork boundary wall and 3) all temporary ancillary development including a) 1 no. site office; b) 1 no. portable toilet; c) 1 no. wheel wash and d) improvement to the site entrance, access gates and access road and internal access tracks

Refused0.5 km11 July 2019
17222

For the phased filling and re-contouring of two exisiting dormant sand/gravel pits (contained within the same landholding) with inert soil and stone which will be partly imported and partly derived from the existing piles of everburden surrounding each pit.

Refused0.6 km22 June 2018
22498

Erecting a 27m high lattice telecommunications structure together with antennas, dishes and associated telecommunications equipment all enclosed by security fencing and extend existing access track

Refused0.7 km01 July 2022
2560816

Erect a 24 metre high lattice telecommunications support structure together with antennae, dishes, and associated telecommunications equipment, all enclosed in security fencing

Refused0.7 km02 December 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required