Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Coolderry Dromintobin North Dromintobin South Knockbrack Lower , Knockbrack Upper Monaskeha Oakfield and Ruanard (townlands) , Ardnacrusha Co. Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 329 nearby planning records within 5 km where a location match is available.

Matched source
2460485
Project type
One-off house
Coverage
5 km radius
329Nearby applications
10%Refused
295Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2460485

A 10-year planning permission for a solar array. The development will consist of c. 330,000 m2 of solar panels on ground mounted frames, 13 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the R471 public road to connect solar array field parcels, security fencing, internal CCTV, access tracks (upgrade of existing and new), upgrade to 1 no. existing agricultural field entrance and creation of 2 no. new entrances on the R471 and 1 no. new entrance on the L70382, 2 no. temporary construction compounds (including site offices and welfare facilities), landscaping and all associated ancillary apparatus and development works. The proposed development provides for minor modifications to the solar array permitted under Clare County Council Reference P22/591 / An Bord Pleanála Reference ABP-316043-23. These modifications comprise the omission of 1 no. single storey control cabin and associated electrical transformer unit, omission of solar panels and access track, and reconfiguration of internal cabling. The solar array will connect to the national grid and will have an operational lifespan of 40 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Granted0.0 km16 October 2025
211264

Of as constructed: dwelling house, garage, waste water treatment system, percolation area, entrance, site boundaries and all associated site works

Granted0.3 km27 July 2022
211238

For the construction of three single storey detached houses, each with a single storey detached garage and a waste water treatment and disposal system, and all associated works, in accordance with the proposed master plan to complete and terminate the existing 'cluster' submitted with approved planning application, P09/743, to include extending the existing private road and footpaths, surfacing to match existing and providing additional street lighting

Granted0.7 km06 May 2022
22141

Of as constructed garden shed and glasshouse and also RETENTION permission for garage conversion to sitting room in dwelling house,

Granted0.8 km16 May 2022
20183

To construct a slatted unit with an underground slurry storage tank for housing livestock

Granted0.8 km23 June 2020
18392

For demolition of existing shed to rear of garage, conversion and extension of existing garage to self-contained apartment ancillary to the existing Residential Care dwellng on site and all associated works above and below ground

Refused0.8 km04 October 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required