To build a new house, install a waste water treatment system and all associated and ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Doolin Tld. , Doolin , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 174 nearby planning records within 5 km where a location match is available.
- Matched source
- 25244
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To build two detached log cabins for the purpose of providing holistic therapies within the curtilage of Aille River Hostel and all associated site and ancillary works
To build an extension onto the existing hostel and all associated site and ancillary works
For development which will consist of the conversion of 8 No. existing holiday homes into 16 No. holiday suites, the demolition of rear garden walls, construction of external terraces to the rear and associated ancillary site works
For the following works to Hotel Doolin. The works involve a) New Store area to the NE/SE Elevation b) to construct a single storey extension to the hotel in the internal courtyard area c) to construct an extension to the ground floor bar area on the SW Elevation along with associated site works
To RETAIN works to Doolin Hotel which involve the following: a) the external storerooms, the additional floor area on the ground floor and first floor, additional first floor bedroom, along with changes made to the North-East elevation, b) the glass roof, enclosed courtyard reception and changes made to the North-West elevation, c) the external canopy, additional floor area to the bar on the ground floor and changes made to the South-West elevation, d) the additional boiler house, service areas and changes to the North-East elevation, e) the changes made to the external elevations of Hotel Doolin in the courtyard area, f) the extension to the ground floor kitchen area, storeroom, external stairs, outside bar area and the covered walkway in the internal courtyard, g) the changes made to the external standalone store areas, h) the extension to the first floor function room, i) the extension to the building granted under P17-359, j) the external signage for Hotel Doolin
Source match
Matched from public planning record 25244The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report