For a new building comprising of areas for car show room, photo booth, customer area and all associated and ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballard Road , Miltown Malbay , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 284 nearby planning records within 5 km where a location match is available.
- Matched source
- 25301
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Of the auxiliary parking area and entrance from the existing site area, the subject of planning permission ref 25/301 and all other associated site and ancillary works
Of the changes made to the building as granted under P03/1267. The retention changes include the following a) increase in floor area b) windows and doors omitted / added and their finishes c) the increase in roof height d) projections omitted / added. RETENTION permission is also sought for the outbuildings and canopy areas. PERMISSION is being sought to add a new extension along with ancillary site works
Of the rear shed building along with ancillary site works
The development consists of a private garage and associated site works
Proposes to carry out the following development. The construction of a new housing estate development consisting of: a) 27 no. residential units comprising of: 8 no. 3-bedroom houses, two-storey semi-detached, i.e. Type A. 2 no. 4 bedroom houses, two-storey semi-detached, i.e. Type B. 1 no. 2 bedroom house, single-storey detached bungalow, i.e. Type C. 12 no. 2-bedroom apartments, two-storey terraced, i.e. Type D. 4 no. 2-bedroom apartments, two-storey semi-detached, i.e. Type E. b) Demolition of existing dweling house. c) 46 ancillary car parking spaces within the development. d) The construction of vehicular and pedestrian access points to the site. e) Pedestrian link to the adjoining Ballard Road housing estate. f) On-site sewage treatment with connection to main sewer. g) Alterations to ground levels to accommodate the development. h) Varied boundary treatments and landscaping works. i) Surface water management will include attenuation and overflow. j) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environment Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
Source match
Matched from public planning record 25301The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report