Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 882 nearby planning records within 5 km where a location match is available.
- Matched source
- 25327
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Extensions as constructed and all associated ancillary site works and services
Extension and alterations to existing circa 147.36 sqm dwelling and the upgrading of the on site treatment system. The works involve the demolition of an exiting kitchen extension to rear of circa 20.27 sqm and the construction of a proposed new extension in lieu of same incorporating a new kitchen and dining room measuring circa 25.28 sqm. The works will also include for alterations to the current layout and elevations. In addition to the extension works, permission is also being sought for the upgrading of the onsite treatment system to a proposed new secondary treatment system and percolation area to current EPA guidelines and all associated site works
Removal of existing septic tank, installation of new wastewater unit, polishing filter to current standards and associate works
Storage shed to rear of existing dwelling and permission removal of existing septic tank, installation of new sewage system with soil polishing filter and associate works
Works to restore and extend an old mill building which was semi-derelict in 1990. The works consisted of restoring, repairing the stonework and the local brickwork, replacing the roof which was in danger of collapse, installing new windows, repairing and replacing timber floors, installing thermal insulation and plumbing and electrical services. Constructing a new spiral stair measuring 4.3m² in its footprint to provide access externally to the first floor and lower ground floor. All these works were completed in several phases between 1993 and 2001. This planning retention application is to retain the works completed on the whole restoration and repair and the construction of the new external spiral stairs. It is also to change the use of the former mill building to residential use
Source match
Matched from public planning record 25327The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report