Section 42 extension of appropriate period - 21/451 - (1) a 92.22 m2 dormer extension to the front (western) roof, (2) a new flat roof replacing a pitched roof to the porch and (3) all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St Michaels , Rocky Valley , Kilmacanogue
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,833 nearby planning records within 5 km where a location match is available.
- Matched source
- 25328
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
(1) a 92.22 m2 dormer extension to the front (western) roof, (2) a new flat roof replacing a pitched roof to the porch and (3) all associated site works
Revision of the boundaries of the original single storey property on the site with the removal of its existing wastewater treatment and to connect the wastewater disposal to the proposed scheme infrastructure. The closure of an existing private domestic dwelling access lane and to propose a new vehicular and pedestrian access point to the existing dwelling via the proposed scheme access roads and footpath, and to incorporate the land space of the existing entrance laneway into the private open space and gardens of the proposed units by means of retaining the existing healthy mature trees and to construct a soft landscaping scheme over the existing hard surfaced laneway, and where possible incorporating all retrievable and healthy native species of mature hedgerows and overgrowth that previously defined the existing laneway boundary. To revise the vehicular access of the existing dwelling to use over the newly proposed scheme roads and footpaths. Ancillary works and appropriate boundary treatments to the existing dwelling. To construct a 4 no. housing scheme consisting of 1 no. single storey and 3 no. detached split level two storey dwellings. Connection to public services and utilities. Ancillary hard and soft landscaping. Ancillary culvert bridge to accommodate transversing the existing watercourse with the scheme road and entrance. Ancillary boundary treatments including the retaining of all mature trees and hedgerows if necessary. Ancillary works
Alterations to window arrangement to front side and rear of existing dwelling, new internal layout of existing dwelling, creation of attic storage area in existing attic, 4 velux windows to front of dwelling and associate works
Construction of 2000mm high boundary wall to front residential garden and associated site works. Wall to be constructed in solid concrete blockwork with natural stone facing to R755 regional road, inside finished in pointed blockwork, top of wall finished with random natural stone capping.
The demolition of an existing dwelling, construction of 12 detached dwellings, upgrading of existing entrance to public road, connection to all services and associate works including roads, footpaths, boundaries and boundaries treatments, open spaces and landscaping, attenuation areas
Source match
Matched from public planning record 25328The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report