The development will consist of: (i) The construction of a three-storey extension to the north of the existing school building consisting of a two-classroom special education needs unit with ancillary accommodation, classrooms, staffroom, and all associated ancillary accommodation; (ii) Demolition of 3 No. prefabricated buildings and a shed; (iii) Internal alterations to the existing building to create a connection to the proposed extension at ground and first floor level; (iv) Provision of a temporary site entrance along the N80 to facilitate construction access (v) Construction of a new carpark, EV Chargers, set-down areas, external soft play areas, sensory garden, landscaping, boundary treatments, footpaths, paving and all associated site works to complete the development.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Gaelcholáiste Cheatharlach , Askea , Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 694 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560219
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
For the installation of a prefabricated building on site to be used as a kitchen to serve lunches to our students under the schools meal scheme, connection to services and all associated site works
The construction of a two-storey standalone extension (circa 425m2) including three general classrooms, a science lab., preparation area, toilets and ancillary accommodation with associated site works
For a 49.5m2 two storey extension to the side of our dwelling together with all associated and ancillary site works
Retention permission for the change of use of an adjoining domestic garage to use as a habitable part of an existing dwelling and all associated site works
The construction of a standalone building to the rear of our existing premises to be used in conjunction with our existing community centre as a counseling/training hub, connection to services, associated parking and all associated site works
Source match
Matched from public planning record 2560219The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report