To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Maghera , Inagh , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
2% of nearby decided applications were refused. The preview found 130 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560499
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For (i) the house and garage as constructed on site in variance from that granted under P8/26123 and (ii) the extension to the garage for use as a self contained granny flat
To construct an entrance and access road to existing forestry block along with ancillary site works ( Site 1 )
The development will consist of the construction of a new dwelling-house, detached domestic garage, new entrance, installation of a new wastewater treatment system and percolation area, and all associated site work
The development consists of RETENTION of alterations to granted application P19/865 including: dwelling position; dwelling alterations including additional velux windows to front elevation, additional door to west elevation, additional door and relocated window to rear elevation, relocated window to east elevation; all ancillary site works
To construct an extension to the side and rear of the existing dwelling house, with all associated site works,
The full report covers all 130 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2560499The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report