Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Cavan General Hospital , Lisdarn , Co Cavan

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

6% of nearby decided applications were refused. The preview found 635 nearby planning records within 5 km where a location match is available.

Matched source
2560592
Project type
One-off house
Coverage
5 km radius
635Nearby applications
6%Refused
598Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2560592

For (a) a single storey modular structure at first-floor level containing a laboratory (b) PERMISSION for the construction of an extension to this modular building comprising a further single storey modular structure at first floor level containing a new laboratory; connection to existing services, and all associated site development works

Granted0.0 km25 November 2025
2460077

For Electrical Infrastructure Upgrade Works on the hospital campus which includes: 2no. new Substations. Substation Building 1 is located to the south west of the site and includes an associated compound and a containerised generator. Substation Building 2 is located to the north of the site and includes an associated compound and a containerised generator. In the location of Substation Building 2 works also include a new water tank, pumphouse, a new oil tank with associated fencing, and a gas compound containing 4no. gas tanks

Granted0.1 km14 June 2024
22103

For a 5,236 sq. m. three storey extension, with plant room at roof level, together with all necessary ancillary site works. The extension shall comprise of Emergency Department at Lower Ground Floor level, Endoscopy Unit and link corridor at Ground Floor Level, Inpatient Bed Ward at First Floor Level and Plant Room at Roof Level. It will also include the installation of Photovoltaic Panels on the roof of the existing hospital. The site works will include the provision of a carpark adjacent to the extension comprising 44 car spaces, 5 motorbike spaces and bicycle bay and a carpark comprising 150 parking spaces on the internal access road to the east of the extension

Granted0.1 km04 May 2022
2560714

For the construction of a standalone bus shelter and all ancillary site development works

Granted0.1 km30 January 2026
19100

For the following works: change of use of existing laundry building to be used as a medical file store, to carry out alterations to existing building and undertake associated site works

Granted0.1 km09 May 2019
2460276

For the development of 7,588sqm accommodation, will comprise the following: 1) New 5 storey extension to accommodate an Emergency Department at Lower Ground Floor, an Endoscopy Unit at Ground Floor, Inpatient Ward Accommodation at First, Second and Third Floor, and Plant area at Fourth Floor 2) A link corridor to connect the proposed extension at ground floor level to the existing hospital at lower ground floor level. 3) External ASHP Compound and Plant 4) Waste Hold 5) Switch room constructed independently to the main build 6) 37 no. car parking spaces (including 10 no. accessible spaces and 4 no. EV charging spaces) 7) 7 no. motorbike spaces 8) All boundary treatments, vehicle and pedestrian accesses, landscaping, and associated site development works

Granted0.1 km11 February 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required