Renovate and reinstate existing abandoned residential dwelling to include reinstatement of roof structure. Permission is sought to make alterations and to erect an extension to existing abandoned dwelling. Permission is sought to install wastewater treatment facilities to current EPA standard and sink a new bored well water supply and and all associated site and ancillary works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Dott's Cottage , Meetings , Avoca
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 258 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560961
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Bedroom at dormer level and associated works
A proposed replacement waste water treatment system to EPA standards in lieu of existing septic tank and associated works
As constructed domestic garage located on site
Change of use (removal of planning condition no. 3 of planning ref. no. 04/113) from restricted use as a dwelling to use by all classes of persons
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
The full report covers all 258 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2560961The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report