Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 1,640 decisions within 5 km, 3 exact-site or onsite candidate records, and 182 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
182 structured nearby appeal records.
182 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Application to An Bord Pleanala for Strategic Housing Development - 426 no dwellings, crèche, residential amenity building, active open space, greenway
Large-scale Residential Development - proposed modifications to the previously approved Strategic Housing Development permitted under ABP-305476-19 as amended by ABP-311676-19, currently under construction which will consist of: The omission of a 2-storey split level residential amenity building of c.325 sqm and the reconfiguration of the open space area located to the east of the apartment buildings to include the provision of active outdoor gym equipment, enhanced passive open space and all associated site works
New Frosted Glass Window to Existing Gable Wall at Attic Level Along with Rooflights to Front Slope of Roof
Development relating to a Large-scale Residential Development consisting of modifications to the Strategic Housing Development permitted under ABP Ref.: ABP-305476-19, as amended by ABP Ref.: ABP-311676-19.The proposed modifications to the previously approved development will consist of: The provision of a single-storey Active Open Space Building (c.206 sqm) located to the north-west of the overall permitted SHD lands adjacent to the playing pitches comprising a multi-purpose room (c.101.5 sqm) with 2 no. changing room areas of c.26 sqm, ancillary changing room for referees (c.10 sqm), storage area (c.17.5 sqm.), kitchenette (c.6 sqm), WC facilities as well as the associated omission of a 2-storey split level residential amenity building of c.325 sqm and all associated site development works. The proposed development also consists of retention permission for the following works: Reconfiguration of the open space area located to the east of the apartment buildings that includes active outdoor gym equipment and enhanced passive open space
Attic conversion including new rooflights to front and rear roof slopes along with new window in existing gable wall
Attic conversion including dormer window to front and dormer window to rear along with frosted window in existing gable wall of existing dwelling
The brief summarizes the pattern across all 1,640 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record sh201903The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief