Amend the design of the approved development (Planning Reference: 19/627 and ABP-305289-19) which comprises consent for a Solar Farm within a site area of 19 hectares consisting of solar photovoltaic panels covering an area of up to 9.8ha on ground mounted steel frames, 1 no. on-site substation; 3 no. inverter/transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services within the townland of Ballymoney, near Arklow, Co. Wicklow. Planning permission was sought for a period of 10 years. Proposed amendments include (1) relocation of part of the internal access track, and (2) a gate will be added along the access track
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballymoney, Kilbride ED, The Municipal District of Arklow, County Wicklow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 540 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560313
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Solar farm within a site area of approx. 19 ha consisting of solar photovoltaic panels covering an area of up to 9.8 ha on ground mounted steel frames, 1 no on site substation, 3 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years
Side extension, which includes 2 bedrooms, wc utility and larger kitchen to existing dwelling, new roof to existing rear section of existing dwelling, removal of existing septic tank, new wastewater system and polishing filter and associated works
A 10 year permission for the construction of an energy storage facility within a total site area of 0.48 hA to include containerised battery storage modules on concrete support structures, electrical transformer / inverter stations, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, lightning protection poles and ancillary equipment
A 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy storage modules; lightning protection masts; Perimeter security fencing; Access tracks; undergorund cabling; temporary construction compound; tree plating; drainage infrastructure and all associated ancillary site development works
Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application
Source match
Matched from public planning record 2560313The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report