For works to an existing Above Ground Natural Gas Installation at Barntick, Clarecastle, Co. Clare. The development will consist of the replacement of approximately 101m of existing 2.4m high chainlink perimeter fencing, including associated access / emergency gates with new 2.4m green palisade security fencing / gates and an additional 1.5m of 2.4m high green palisade security / gates and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Barntick , Clarecastle , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 739 nearby planning records within 5 km where a location match is available.
- Matched source
- 19661
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the installation of 16 no. storage containers to be used as self storage units at our existing storage yard including ancillary site works
To Extend the Appropriate Period of Planning Permission P15/288 for the construction of an agricultural livestock unit, underground slurry storage tanks and all associated site works
To revise the design of the development previously authorised under planning permission ref no. P23/60081 along with all associated site works
To demolish an existing garage, to construct a single- storey granny flat to rear of existing dwelling, to construct a new side extension to each side of dwelling with minor internal alterations, to demolish the existing private garage and to construct a new private garage elsewhere on site, and to upgrade the existing wastewater treatment system
To RETAIN a) the existing dwelling house as constructed, b) the existing tyre centre as constructed, c) the temporary use of the static mobile home and Planning PERMISSION to i) complete the construction of the dwelling house, ii) use the mobile home until construction of dwelling house has been completed, iii) completion of waste water treatment system installation including all ancillary site services and works
Source match
Matched from public planning record 19661The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.