Proposes to carry out the following development. The construction of a new housing estate development consisting of: a. 18 no. residential units comprising of: (1) 4 no. 1-bedroom apartments, i.e. Type A (2) 12 no. 2-bedroom apartments, i.e. Type B (3) 2 no. 3-bedroom apartments, i.e. Type C b. 27 ancillary car parking spaces within the development. c. The construction of pedestrian access point to the site. d. New Vehicular access point to the site. e. Connection to main sewer and watermain. f. Alterations to ground levels to accommodate the development. g. Surface water management will include attenuation and discharge to surface water network. h. All ancillary site works to include boundary and landscaping works. In accordance with the Habits Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Boheraroan, Urlan ED, Shannon Municipal District, County Clare, Munster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 315 nearby planning records within 5 km where a location match is available.
- Matched source
- 208000
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the construction of a domestic home fuel store and also RETENTION permission for existing portacabin to be used as an office to the north side of existing garage forecourt including ancillary site works
For development which will consist of (1) The demolition of existing on site storage buildings (2) The construction of a new single storey dwelling house, temporary septic tank, ancillary site works and connection to public services
Of the change of use of first floor storeroom of former laundrette permitted under P96/509 to a one bedroom apartment including internal alterations to same, provision of private open space to rear and all ancillary site works
For the construction of a one bedroom apartment including alteration and extension of existing building, alterations to elevational treatment of existing apartment No. 2 & reduction of rear yard of apartment No. 3. Also for construction of new gate to rear common area, & private yard for proposed apartment including connections to services & all ancillary site works
To construct a new dwelling house and connect to public water and sewer along with ancillary site works
Source match
Matched from public planning record 208000The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report