To construct 1) 2No. Grain stores, 2) Modular Malting Units 3) Storage Shed to house 2No. Water Filtration Units with 4No. Stainless Steel Cylindrical Water Storage Tanks and 4) 3 No. Silos with concrete aprons and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Newstown, Ballintemple ED, The Municipal District of Tullow, County Carlow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 153 nearby planning records within 5 km where a location match is available.
- Matched source
- 232
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
(i) the construction of a new building of 881m2 to house 16 no. 3.8m diameter and 13.5m height malted grain silos and associated gantries, 2 no. grain cleaners and associated plant along with bulk out loading facility, (ii) construction of a new boiler house of 95m2 and a new ESB substation and customer switch room of 25m2, (iii) construction of 6 no. 22m diameter and 21.5m height grain storage silos with associated underground conveyor system along with gantries and ancillary equipment to a max height of 25.2m to replace the previously approved 2 no. grain storage buildings as part of planning ref no. 23/2 (iv) relocation of existing weighbridge and construction of a new weighbridge (v) relocation of previously approved Modular Malting Units, Storage Shed and 4 No. Stainless Steel Cylindrical Water Storage Tanks (planning ref no. 23/2) (vi) all on a new concrete apron along with all associated site development works
The demolition of an existing Sow house building and the erection of a replacement Modern Sow house building in its place, along with the erection of a second weaner house building and all associated site works. the application is accompanied by an Environmental Impact Statement (EIS) All works and associated site works take place within the curtilage of an existing Pig unit.
Construction of a part two storey, part single storey dwelling, new entrance, appropriate waste water treatment system, bored well, single storey garage and all ancillary site works and landscaping
Construction of a part two storey, part single storey dwelling, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works
For a new agricultural entrance and all associated site works
Source match
Matched from public planning record 232The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report