To retain A. loft conversion, porch extension and alterations to elevations of existing dwellinghouse, B. studio and attached garage, C. mobile home / accommodation unit ancillary to existing dwelling and associated works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Portruan, Grilly ED, Cavan-Belturbet Municipal District, County Cavan, Ulster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 169 nearby planning records within 5 km where a location match is available.
- Matched source
- 21170
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
To retain alterations to existing dwelling comprising conversion of out-building to living accommodation, raised slated roof, alterations to elevations, carport, exposed stonework, garden enclosure and associated works
For development consisting of the construction of a conservatory to the North East elevation of the existing dwelling
Erect detached domestic garage to log cabin property
For the placement of 20 photo-voltaic solar (PV) panels on the house roof (front elevation facing approximately South)
For construction of a part single storey, part one and half storey dwelling, detached single storey domestic garage, new site entrance, effluent treatment system, percolation area & all ancillary site works
Source match
Matched from public planning record 21170The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report