Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

A site at the entrance to the Tullow Wastewater Treatment Plant Bunclody Road (N81) , Tullow , Co. Carlow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 283 nearby planning records within 5 km where a location match is available.

Matched source
2460067
Project type
One-off house
Coverage
5 km radius
283Nearby applications
12%Refused
247Conditional grants
10Refusal reasons

Top refusal reasons nearby

Ecology2
Traffic Sightlines2
Wastewater Percolation2
Design1
Flood Risk1

Nearest similar decisions

2460067

Development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development

Conditional grant0.0 km10 May 2024
223

Development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments

Conditional grant0.0 km28 September 2022
2460161

The proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development

Conditional grant0.1 km23 May 2025
2560035

The proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping

Conditional grant0.2 km10 April 2025
22378

Retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works

Conditional grant0.2 km11 October 2023
2269

For the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works

Conditional grant0.2 km07 April 2022

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required