Alterations to the entrance to my house and farm, retention also sought for an existing concrete base extension to my farm yard and all ancillary works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Uppertown, Dunlavin ED, The Municipal District of Baltinglass, County Wicklow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 247 nearby planning records within 5 km where a location match is available.
- Matched source
- 23537
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The construction of a single storey dwelling house, onsite secondary sewerage treatment system, domestic garage, 2 box stable building, dung heap and all ancillary site works
Cubicle cattle shed and permission also sought for new over ground slurry storage tank and all ancillary site works
Section 42 Extension of Appropriate Period 20/439 - single storey dwelling, Aswaflow wastewater treatment system and soil polishing filter and all ancillary site development works
Provision of a new independent domestic entrance to the south of the site including all associated site works and services. Retention permission is sought for the erection and completion of an agricultural storage shed with ancillary office space including all associated boundary treatments, infrastructure, wastewater treatment systems and site works and services
Single storey dwelling, Aswaflow wastewater treatment system and soil polishing filter and all ancillary site development works
Source match
Matched from public planning record 23537The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report