To construct a farm machinery shed, with all associated site works
Of a steel garage used to store classic cars
To construct a two-storey building incorporating 6 No. 1-Bedroom apartments, and a single storey building incorporating 6 storage sheds to be used in conjunction with the apartments, connection to public services and all associated site works to accommodate the development, all accessed by means of an existing covered passage way (Bow-way)
For development which will consist of the construction of a dwelling house, garage, including connection to public services and ancillary site works
For a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. Permanent extension to the 110kV substation at Knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kV bay and security fencing; 6. Upgrade of access junctions; 7. Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8. 2 no. borrow pits; 9. 2 no. temporary construction compounds; 10. Site Drainage; 11. Forestry Felling; 12. Operational stage site signage; and 13. All associated site development ancillary works and apparatus. The Proposed Development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
To construct 1 no. 1 Bedroom dwelling unit with solar PV panels. Relocation of existing site entrance. Connect to public services and carry out all ancillary site works
To construct a storage shed along with associated site works
To construct a building, in which to provide a space for business and management skills training and career/interview coaching purposes, office administration area, install a wwts and percolation area and all associated site and ancillary services. This building will use the existing access road and entrance through the grounds of the family dwelling house
To a) part demolish renovate & extend existing commercial building to create 2 No. commercial units, b) construct addition car parking spaces and boundary wall together with all associated site development works and services
To A) demolish and existing substandard cottage, B) Construct new dwelling house and garage, C) Widen and realign access roadway, D) Install wastewater treatment system with soil polishing filter, E) Install bored well together with all associated site development works and services
And completion of boundary walls and garden shed
To erect dwelling house, garage, foul sewer treatment plant and percolation area
For the construction of a new single/part two storey dwelling house and garage. This application also seeks permission for new site entrance with gates, access roadway, connection to existing public services, removal of section of front boundary, provision of new boundary walls and fences and all ancillary hard and soft landscaping and site works
To build a dwelling house, access roadway and ancillary site works together with proprietary treatment system
To Extend the Appropriate Period of Planning Permission for P17-453 to construct a dwelling house on site forming part of Site No. 12 Abbeylawn, Kildysart Road, Ennis, Co. Clare, connect to public water supply, connect to public sewer and carry out all ancillary site works
For the development of a dwelling house with septic tank and percolation area together with ancillary site works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
To construct a new detached dwelling house together with associated site works and services
For relocation and refurbishment of Maxol café / deli area, including food preparation and clean-up areas with chiller / freezer rooms (Area 65.55sqm); change of use of children's play area to restaurant use (Area 48.25sqm); provision of a second hot-food takeaway offering including order/sales counters, kitchen and clean-up area, chiller/freezer rooms, store and supervisor office (Area 95.44sqm incorporating change-of-use area 48.25sqm); revised circulation area (Area 87.61sqm); revised seating area (Area 74.93sqm) and revised Maxol back-of-house area including ATM room, manager office, staff facilities and electrics room (Area 93.62sqm); sale of hot food for consumption both on and off the premises; provision of external customer seating area at northern elevation of forecourt building (26 seats); provision of additional external corporate signage to forecourt building on eastern elevation (Area 0.57sqm); installation of dedicated grease trap for the new hot-food area under previously approved parking area at rear of existing forecourt building; provision of an additional M&E switch room (Area 12.69sqm) and all necessary air-handling / ventilation / extract-air equipment at rear of existing building; lowering section of stone wall on northern and eastern boundaries to 450mm overall height around Maxol ID totem sign and all associated site works
For detached single storey dwelling, detached domestic garage/home office, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
To erect a 24m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
For a 3 bay shed
For the change of use from residential to recreational camping site and the construction of six No. cabins for the purpose of short stay accommodation, a gravel access path, 7 car parking spaces a waste water treatment system, preparation of an Natura Impact Statement and ancillary works
To construct 1 no. dwelling house and garage with landscaping layout and new site entrance, connect to proprietary waste water treatment system, connect to public services and carry out all ancillary site works
For 2 dwelling houses with private garages, new entrance and access road, erection of fencing along rail line, installation of water and sewerage treatment facilities along with all associated works
For development which will consist of the following, (a) Remove existing front and part of side boundary wall (b) Construct new block wall and piers to match height of existing adjacent wall. (c) Increase entrance width and install security gate. (d) All ancillary site works
For the use of the annexed ground floor bedroom and utility room as independent accommodation including a separate side entrance door
The development will consist of the Construction of 8 No 2-bedroom apartments on three floors, with site works and connections to services
To alter the design of 1No. split level house and to change the site boundaries as granted under P19/91 along with associated site works.
To Extend the Appropriate Period of Planning Permission P11-447 to construct dwelling house, garage, entrance, effluent treatment system including all associated site works and services
For a Proposed Serviced Caravan/ Motorhome Park consisting of set down bays for 37 static Mobile Homes, 19 Motorhomes, Open Space Area, Facilities Building, Bin store/ Recycling Compound, relocate the existing entrance addition 51 no. on-site car parking spaces Bed and Breakfast Building and all associated ancillary site works
To build a new dwelling, install a wastewater treatment system and all associated site and ancillary works.
For the change of use of a ground floor commercial unit and first floor apartment building into three apartments including all associated layout and elevational changes
To construct a dwelling house with a wastewater treatment system, percolation area and associated site works
To Extend the Appropriate Period of Planning for P16/301 for the Installation of a 2 Classroom Portacabin with toilet facilities including connection to public services and to erect new perimeter fencing on 2 sides of same and for RETENTION permission for the installation of existing Resource Room Portacabin on site including ancillary site works
For the construction of a dwelling house, garage, treatment unit and all associated services
Permission to RETAIN the recently constructed replacement fence to the rear of property
To build a new dwelling house, install a wastewater treatment system, create a new entrance to the public road and all associated site and ancillary works
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt
To RETAIN and extend existing apartment
To Extend the Appropriate Period of Planning on P16/826 on the Grant of Outline Permission ( Planning Ref. No. P13-326 ) which will consist of the construction of a private dwelling house, garage, entrance, waste water treatment system/percolation area along with associated site works and services
For a dwelling house with attic accommodation, shed/workshop, vehicular entrance, connection to services, septic tank, reed bed treatment systems and willow-planted distribution area and ancillary site works
The development will consist of a private dwelling c/w private garage and ancillary site works
The development will consist of a dwelling house, c/w private garage and all ancillary site works
For development, the development consists of the construction of a slatted unit extension onto existing agricultural building and associated site works
To develop 2 portions of land at the Aisling Estate, Shanvogh, Ennis, County Clare. The extent of the development will consist of 14 No. apartments in 2 blocks of 4 storeys and 2 No. houses
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi. Upgrade of access junctions; vii. Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix. 2 no. temporary construction compounds; x. Site drainage; xi. Forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
For a material change of use from existing Bed and Breakfast facility, currently used as breakfast dining rooms, to Cafe and Tea Rooms, Permission for a new wc extension and associated site works
For the construction of a single dwelling house, proprietary effluent treatment system with associated percolation area with tertiary treatment, site access roadway and all associated site services