Change of use of the first floor office accommodation to a one bed apartment; change of use of the attic floor office accommodation to a studio apartment; new dormer window within the rear roof slope; ground floor which is currently vacant remains as office accommodation; all necessary ancillary site development works.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.
Conversion of an existing attic to non-habitable storage use; removal of existing hip roof to half 'Dutch' hip to side; provision of dormer to rear.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
Removal of existing side entrance porch; new single storey flat roof front extension to consist of a living room and study; two storey flat roof side extension to consist of an entrance porch and kitchen/dining room at ground floor and an en-suite/wardrobe at first floor; single storey rear flat roof extension to consist of a utility room and wc; rear first floor flat roof extension to consist of a bedroom; internal remodel and general upgrade of the main dwelling to suit the new proposed layouts; internal remodel and upgrade plus the construction of a new entrance porch to the existing family apartment to the rear of main dwelling. All structural, drainage and associated site works to be implemented.
Retention of 2 single storey extensions at either side of house. Proposed single storey extension at rear.
Single storey porch and enlargement of games room to front of house; Single storey kitchen extension to rear of house; Attic conversion for study room with projecting dormer window to rear of house and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, removal of existing chimney, new access stairs, and flat roof dormer to the rear.
916sq.m new canopy overall height 5.8m over existing external retail area to the north of the existing polytunnel structure together with all associated site works.
Conversion of existing attic to non-habitable storage use; remodel of existing hip roof to half 'Dutch' hip to the side; provision for dormer to the rear.
Construction of a three storey building, accommodating 13 residential units and a ground floor cafe (55sq.m); The proposed dwellings are comprised of 6 one bedroom ground floor apartments, with 7 three bedroom duplex units overhead; All associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments, bin & bicycle storage etc; Access to the development will by via the permitted vehicular entrance to the south-west serving the Gordon Park residential development on site bounded to the west by the Old Naas Road, to the south and east by a permitted residential development (Ref. SD21A/0327) known as Gordon Park and is located in the townland of Brownsbarn.
Single storey side extension and a single storey rear extension with internal modifications and all associated site works.
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (4.5m x 1.5m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.1m x 1.4m) is a high level sign to replace existing on the southern elevation. Sign No.3 (4.5m x 1.5m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (6.1m x 2.1m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.6m x 2.1m) is a high level sign to replace existing on the southern elevation. Sign No.3 (5.3m x 2.2m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
Demolition of single storey Extensions to side and rear and construction of 2 storey Extension to side and rear. Single storey extensions to front and rear and alterations to front facade to include new feature gable at first floor level and all associated site development works.
A) 2-Storey extension to side and front, with a wall proposed on boundary with Property No. 8 St Brigid's Road b) Single storey extensions to front and rear c) Refurbishment including change of fenestration and removal of chimney to rear d) Enlargement of existing vehicular access e) All related works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access Stairs, and flat roof dormer to the rear
The Demolition of the Existing sub-standard porch and the demolition of the existing sub-standard single storey extension at rear and the Erection of a two storey extension to the front, side and rear and a single storey extension to the rear. Also the erection of a two car garage and garden tool store at the rear and the widening of the existing vehicular entrance.
The development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: • Construction of a single storey main building (RNG Building - c.1,124.3 sq.m) with air handling units (AHUs). • External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. • MV substation & Stormwater attenuation pond. • 12 no. car parking spaces (2 of which are EV parking spaces and with 1 accessible parking space). Bike parking shelter and bin store. • New road access provided from adjoining permitted estate road (granted under SDCC Ref. SD24A/0107W) and including bridge over existing watercourse. • Internal road and footpath layout, perimeter fencing, security gates and retaining wall. • Landscaped and planted areas including riparian corridor and swale. • Temporary Construction compound and parking area (including temporary bridging of existing watercourse/field drain). • All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,384.2 sq.m
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
Proposed 38m2 flat roof ancillary garden studio located to infill irregular space at rear (western side) of existing garden along with associated siteworks
GROUND FLOOR EXTENSION AT THE FRONT AND SIDE OF THE EXISTING HOUSE, AND EXISTING GARAGE REFURBISHMENT TO ACCOMMODATE FAMILY FLAT, WITH MAIN ENTRANCE ALTERATION AND ALL ASSOCIATED SITE WORKS.
Conversion of attic space to new bedroom; works include alteration of front facade of dwelling and all associated site development works.
Upgrading works to existing detached bungalow to include: alterations to existing external window and door fenestration; new external window openings; minor demolition works; new single storey extension to rear; new canopy to rear; new flush type roof light; internal reconfiguration; external landscaping; SuDS drainage and all associated ancillary works to facilitate the development.
Existing front glazed canopy for removal; proposed ground floor partial front extension of restaurant with flat roof over, extended floor area 75sq.m; new glazed canopy over to partial area of front facade & installation of 3 new signs on front facade.
Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound.
Bungalow to rear of existing dwelling and all associated site works
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Construction of a residential development comprising 3 three to five storey blocks of 74 apartments (20 one bed, 48 two bed and 6 three bed) all with associated private balconies/terraces to the north/south/east/west elevations; vehicular and pedestrian access from Hayden's Lane to the north west of the site and closure of the second existing vehicular entrance at south west of site; pedestrian access from Griffeen Park to the south east of the site; provision of car and cycle parking, public and communal spaces, bin stores and all associated site development and clearance works, landscaping, boundary treatments and other servicing works.
Construction of a New 3-bedroom bungalow to the rear of existing dwelling and all associated siteworks.
Temporary single storey prefabricated building located on the existing school staff car park within the site, measuring a total of 855.3sq.m and will include 9 general classrooms, staff & pupil toilets, ancillary staff/multi-purpose room and circulation. It will also include minor temporary alterations to the existing hard and soft landscaping to accommodate the temporary accommodation. These prefabs will be used to facilitate the remediation works in the Phase 1 Griffeen Valley ETNS building and will be required for a period of 12 months from the date of commencement of the works on site.
Permission and Retention permission for development at this site (total c. 0.42 ha) at Maxol Service Station, Newcastle Road, Adamstown, Lucan, Co. Dublin, K78 X4E1 (c. 0.29 ha) and the adjoining unused lands (c. 0.13 ha) to the south located at the junction of Newcastle Road and the Adamstown Industrial Estate access road. The development for which permission is sought will consist of: Change of use and incorporation of the unused lands (c. 0.13 ha) into the service station site and removal of the intervening boundary; Construction of an EV Charging Hub (consisting of 6 No. EV charging car parking spaces, canopy, substation and ancillary plant, and associated signage (6 No. x 2.5 sq m above the charging spaces, and 2 No. x 9.5 sq m single-sided internally illuminated totem signs)); Revisions to the overall site layout (resulting in the provisions of 33 No. car parking spaces (an increase of 15 No. car parking spaces) excluding the EV Hub spaces), motorbike and bicycle parking, alterations to vehicular circulation, relocation of air and water services, offset fills, vents and associated chambers; Provision of replacement foul water treatment plant with associated plant and percolation area, foul drain infrastructure for future connection to foul sewer, and new external lighting; changes to levels, hard and soft landscaping including revised boundary treatments, associated site servicing (water supply, foul and surface water drainage including surface water attenuation measures), all other associated site development works above and below ground. Development for which retention permission is sought consists of: An external gas tank with associated enclosure; Extensions to the filling station building comprising an entrance porch / lobby area (13 sq m) and back of house extension (34 sq m); Alterations to the internal layout of the building including the incorporation of a c. 48 sq m back of house area into the front of house area, increasing circulation spaces; Extended café/restaurant for the sale of hot and cold food for consumption both on and off the premises (from 32 sq m to 42.5 sq m), including a change of use to restaurant use of a 20 sq m area. The permitted café seating area (50 sq m) and the net retail area (100 sq m, including a 12.5 sq m ancillary off licence) will remain unchanged.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
Conversion of attic space comprising of modification of roof structure; raise gable c/w window and 'Dutch' hip; access stairs and flat roof dormer to the rear.
Construction of semidetached 2 storey 3 bedroom dwelling with habitable attic room, with dormer roof window on rear slope of roof,with new driveway and partial dishing of kerb & all associated site works.
Change of roof profile from hip end profile to accommodate attic conversation with dormer extension to rear. 1 no. velux roof light to front. All associated site works at No. 8 Griffeen Glen Chase, Lucan, Co. Dublin.
New stainless stell and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 internally illuminated advertising panels each of 2.0sq.m area on the public footpath.
Permission is sought for extension, conversion and alteration works comprising of a new single storey extension to the rear adjoining the existing garage, which is to be converted into habitable space accommodating a new living room, guest bedroom and ensuite; the upgrade and raising of the flat roof and parapet to the south, east and along the north facing shared side boundary wall, which looks to include 3 no. rooflights; including a new ramped entrance canopy to the front with a new external door and window replacing the existing garage door; including all associated internal alteration, removal, and ancillary works
Single storey pitched roof extension to rear with 5 'Velux' rooflights and new stainless steel flue; new pitched roof porch extension to entrance hall; new bay window at ground floor level to front with matching windows on bedroom over; new flat roofed brick finished external store to front and adjoining rear boundary wall of no. 10 & 12 Grifeen Glen Wood and associated site works.
Sub-division of existing site to allow for the construction of a new 2 storey, 3 bedroom detached dwelling with a pedestrian access gate in the side boundary wall, all to the side of the existing dwelling and all associated site works.
Retention of the single storey garage / shed with flat roof in the rear garden of the existing dwelling and all ancillary works necessary to facilitate the development.
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
New office space at first floor level (66.sq.m); minor alterations on the road frontage elevation (southeast) to include additional windows for new offices; all works proposed are ancillary to the use of the existing building and business.
The construction of new office space at ground floor level including revisions to the front and side elevations to include external windows and doors, all works proposed are ancillary to the use of the existing building and business.
The construction of new office space at first floor level including enclosing the existing access stairs (total area @ 87.915 sq./mts), all works proposed are ancillary to the use of the existing building and business.
Construction of a two storey side extension to existing dwelling house (planning exempt single storey rear extension previously constructed); new utility; study; ensuite and bedroom with associated internal alterations.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and dutch hip; new access stairs; 2 roof windows to the front and flat roof dormer to the rear.