RED III application Level 5 - The development will consist of the installation of a small-scale non-ground source heat pump system (air-to-water heat pump) including external heat pump unit(s), heat pump enclosure, associated underground pipework, electrical connections and all ancillary site works. The proposed development is located within the curtilage of a Protected Structure (RPS No. 47-04), and therefore constitutes works to a protected structure.Decision record indexed
1) slightly extend existing ground floor extension to rear of dwelling and 2) construct second storey extension over same and all associated site worksDecision record indexed
Change of use of store to residential building consisting of 3 no apartmens with slight alterations to elevations and all associated site works to a protected structure (Ref No 47-02)6 conditions indexed
Top Oil Carnew, Lower Main Street R725, Carnew Co. Wicklow
Placement of a pay-to-use portable waste compactor for the acceptance of residual and food waste and a pay-to-use portable compactor for mixed dry recyclables. This activity requires the developers to possess a waste collection permit/certificate of registrationDecision record indexed
Continuation of use from retail unit to bookmakers office including the installation of satellite dishes, associated shop front signage and all ancillary worksDecision record indexed
A new external LPG tank and enclosure. A new external heat pump and enclosure. All related underground pipework and associated site works. Protected StructureDecision record indexed
Erect telecommunications equipment comprising a Canister antenna, dish, support poles, brackets and all other associated equipment and site development works, and to remove the existing telecommunications installation comprising two whip style antennas and other associated equipment on the chimney, roof and buildingDecision record indexed
Construction of a single storey 2no. Classroom Special Education Unit (floor area = 465sqm) to the rear of the existing single storey School Building (floor area = 1,162sqm), together with minor internal alterations, sensory garden, an enclosed soft play area, basketball court, all weather playing pitch, removal of existing vehicular and pedestrian entrance to site boundary, new pedestrian access (new front site entrance provided with gate, stairway and retaining walls), and significant proposed modifications to main entrance (proposed school entrance to be modified to provide footpaths for pedestrians and car traffic to on-site car parking - 7no. spaces to the front and 21no. spaces to the rear), external stairways, ramps, and all associated site works. Scoil Aodán Naofa is a Protected Structure RPS Ref 47-03Decision record indexed
Construction of a single storey 2 no. classroom special education unit (floor area = 452sqm) to the rear of the existing single storey school building (floor area = 1162sqm), together with minor internal alterations, sensory garden, an enclosed soft play area and all associated sit works (Scoil Aodán Naofa is a protected structure RPS Ref 47-03)Decision record indexed
Works to an existing two-storey house (c. 129 sqm) including the change of use of an existing former single-storey dairy structure (c. 54 sqm) to a habitable space, the addition of a single-storey extensions (c. 6 sqm) and amendments to the existing site entranceDecision record indexed
Demolish existing outbuildings to allow for improved sightlines at entrance. Refurbish and construct an extension to existing dwelling house (area of existing dwelling house: 76.54m) (area of proposed extension: 168.9 sqm). Construct a domestic garage. Upgrade and construct new sewage facilities along with all associated site works. Also permission for retention of existing entrance to site along with all associated site worksDecision record indexed
Former Bank of Ireland Building, Main Street, Carnew
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - change of use from the existing bank to a community-based remote working hub, and all associated refurbishment works to the existing building, and a new, single storey lean-to extension to the rear of the property connected to the existing building by a new pitched roof structure with a glazed entrance and enclosing the existing flat roofed vault, and the erection of a new shopfront and signage at the front of the building including an integrated decorative entrance gate. The aim of the development is to provide an active and vibrant working environment on Carnew Main Street and to promote well-being, inclusion, and community cohesion for those using and interaction with the buildingDecision record indexed