To Extend and Appropriate Period of Planning for P15-636 1) Renovate and extend existing structure on site (an old dwelling house not in active residential use) for residential purposes including the installation of a new waste water treatment system and all ancillary site works (2) Decommission an existing septic tank system (serving an existing occupied dwelling house on site) and replace it with a new wastewater treatment system and all ancillary site works
For development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works
To Extend the Appropriate Period of Planning Permission for P15/636 & P20/875 Renovate and extend existing structure on site (an old dwelling house not in active residential use) for residential purposes including the installation of a new waste water treatment system and all ancillary site works (2) Decommission an existing septic tank system (serving an existing occupied dwelling house on site) and replace it with a new wastewater treatment system and all ancillary site works
For detached single storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance together with all associated ancillary and incidental site works
For the construction of a new dwelling house which is single storey & part two storey, with ground floor garage attached to the dwelling, externally accessed green house, proposed wastewater treatment unit with polishing filter and percolation area, new site vehicular entrance and all associated site works
For construction of a new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
For construction of new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
To erect a dwelling house, garage, entrance, install an effluent treatment system and percolation area and all associated site works
To construct a slatted cattle shed and associated site works
To construct a dwelling house, domestic garage, install a waste water treatment system with percolation area and associated site works
For a new dwelling, wastewater treatment system, polishing filter, entrance and all associated site works
For the construction of a dwelling house, garage, upgraded site entrance, wastewater treatment system and all associated site works
To block up existing combined agricultural / residential entrance and replace with a relocated combined agricultural / residential entrance along with all ancillary site works
To construct a dwelling house, garage, new site entrance, wastewater treatment system and all associated site works
For modification to previously granted planning permission reference number P22-824 to construct a dwelling house, garage, new site entrance, wastewater treatment system and all associated site works
To erect an extension to the side of dwelling house and also for planning PERMISSION to RETAIN existing garage for private domestic use and all associated site works
For to demolish old "outhouses", extend existing dwelling house, install an effluent system, new entrance and all associated site works
To refurbish and extend the existing dwelling house, refurbish 2 no. attached sheds to the left and right of the existing dwelling house and incorporate into the refurbished and extended dwelling house, demolish and rebuild an existing stone building and incorporate into the refurbished and extended dwelling house, demolish a dilapidated shed, install a new wastewater treatment system, along with ancillary site works
To construct a new slatted house and associated site works
To construct a dwelling house, entrance, driveway, wastewater treatment system, bored well and all associated site works
To construct a dwelling house, domestic garage, waste water treatment system with percolation area and associated site works
For the construction of a dwelling house, garage, treatment unit and all associated site works
To construct agricultural slatted unit plus all ancillary site works
Of a) enlarged dwelling house from what was granted under P05/1935 b) 1st floor attic conversion c) chimney location, installation of roof windows and fenestration changes d) 2no. domestic sheds along with boundaries as constructed together with all ancillary site development works and services
Of a) 1st floor conversion dormer windows, rear extensions, alterations and fenestration changes b) detached garage c) installation of new wastewater treatment system and location of soil polishing filter, d) boundaries as constructed together with all ancillary site development works and services
For to erect a dwelling house and garage, entrance and driveway, install an effluent treatment system and percolation area and carry out associated site works
For the phased extraction of 2.9 hectares of sand and gravel over a period of 7 years, on land located in the townland of Ballymaloney. The proposed development includes for the provision of a new site entrance and vehicular access road; on site wheel wash facility; new drainage channel, silt fence and settlement pond; landscaping and buffer planting on the eastern site boundary including a 3m high embankment with hawthorn hedging adjoining the public road; and site restoration works. One passing bay is being developed for vehicular traffic on the public road leading to the site (L3022-8) in the townland of Ballyquin More
Of existing road boundary, trees and road entrance at Coolagoree Hill, Feakle, County Clare V94 T8K0. Planning Grant in 2000 reference P00-1618 condition 2-7 (now withered) refer to unachievable works not then completed and now not required as proven by passage of time.
To erect a dwelling house and garage, entrance and driveway, install an effluent treatment system and percolation area and all associated site works
And completion of an extension and alterations to an existing dwellinghouse and to upgrade existing wastewater treatment system and all associated works
For to extend existing house to the front and rear and raise the roof, internal alterations and carry out associated site works
To erect an extension to the side and rear of the house and all associated site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
To construct a new passive designed dwelling house and storage area complete with sewage treatment system and all ancillary works at site located in Gortaderra, Co Clare. The site has a common entrance off the public road on North boundary that services four separate sites. Three of the sites (2,3 & 4) have existing dwellings in situ that were constructed following grant of planning permission P06/2796 in 2006. The fourth site (no 1) remained undeveloped and is the subject of this planning application.
To RETAIN alterations to elevations and roof of existing house together with all associated site works
For to erect an extension to the side of house and all associated site works
Of two dormer windows, septic tank and percolation area, and an incomplete extension. and also PERMISSION for alterations to the extension and completion of the dwelling place and all associated site works
For the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works
To construct a new dwelling house, garage and wastewater treatment system and all associated works
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To construct a domestic garage along with ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
The development consists of the construction of an extension onto existing slatted unit and associated site works
Of existing farm shed and cattle crush, and PERMISSION to erect a new vehicular entrance and close up existing vehicular entrance and all associated site works
To construct a straw bedded shed with slatted tank and ancillary works
For to erect a dwelling house, entrance, install an effluent system and percolation area and carry out associated site works
To erect a dwellinghouse, entrance, driveway, install an effluent treatment system and all associated site works and all associated site works
For (a) to demolish an existing agricultural shed and (b) to construct a new dwelling house complete with a new entrance, sewage treatment system and ancillary works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.