Of an existing domestic building and PERMISSION to build an extension that will join the existing dwelling house to the building to be retained
Of existing apartment, sun room and shed
To construct a new dwelling house, private garage, site entrance with connection to public sewer and all other associated site works
To construct a new dwelling house with private garage, site entrance, on-site wastewater treatment system and all other associated site works
To RETAIN the existing cottage for use as Ancillary Living Accommodation including all ancillary services and works
For development which will consist for the refurbishment works to an existing cottage to include raising the roof level, the construction of a single storey extension to the side and rear of the existing cottage, the installation of a new wastewater treatment system and all associated site works
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
To construct a dwelling house, garage with a waste water treatment system and percolation area
To demolish the existing rear flat roof extension and construct new pitched roof rear extension, carry out alterations to the existing main roof and carry out elevational changes along with all associated works
To construct a single storey extension to derelict dwelling, to alter existing ground floor plan & elevations, all associated necessary ground works, install new foul sewerage system/percolation area and new site entrance
To construct a two storey extension to include a re-located bedroom to facilitate a home office, a utility room and a plant room
For the following development: a) demolish existing extension to the rear of the existing remaining walls of attached outbuilding; b) construct a new rear extension and side extension to the existing dwelling house; c). construct a new building attached to the dwelling house, to be used for short-term letting purposes; d). elevational changes to the existing dwelling house; e). all associated site works and services
For alterations to the existing domestic garage and planning PERMISSION to make further alterations and to convert the garage to a granny flat along with all associated works
To construct a new dwelling house and private garage with connection to main sewer and water services with all necessary ancillary works
Of a reconstructed structure on the footprint of a longstanding stone cabin with connection to existing on-site facilities and for a change of use from agricultural use to a pre school facility
To RETAIN: 1. The house as built on site, which is a mirror image of that granted under reference P98/1903; 2 The attached Garage and Rear Porch and 3. The Detached Steeltech Storage Shed and for PERMISSION to revise the Boundaries granted under P98/1903 and all associated site and ancillary works
Of (a) extension to existing dwelling house (b) private garage / store (c) new entrance to existing dwelling house
To construct a new dwelling house, access road, entrance, private garage, connection to existing public sewerage & water services along with all associated works
Of existing private storage shed
For the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
Of the rear extension to the rear of the existing dwelling house, along with all associated site works
To replace the existing substandard dwelling with a new dwelling, using existing connections to services and all associated site and ancillary works
To RETAIN the front wall and gate as constructed and planning PERMISSION to complete the front wall and for an extension and refurbishment of an existing dwelling house along with all associated works
To RETAIN changes made to the layout of the dwelling hosue previously granted planning permission under planning reference number P07-2736 and for PERMISSION to complete the development of the first floor dormer area to include 2 no. balcony dormers with all necessary ancillary services
For a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi. Upgrade of access junctions; vii. Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix. 2 no. temporary construction compounds; x. Site drainage; xi. Forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
For a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. Permanent extension to the 110kV substation at Knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kV bay and security fencing; 6. Upgrade of access junctions; 7. Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8. 2 no. borrow pits; 9. 2 no. temporary construction compounds; 10. Site Drainage; 11. Forestry Felling; 12. Operational stage site signage; and 13. All associated site development ancillary works and apparatus. The Proposed Development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
To construct a private garage along with all associated works
Of the existing entrance to the east of their property, and for PERMISSION to: Alter/improve the existing entrance, to include a new field entrance adjacent to it and to build up the existing entrance to the west of their property and all associated site and ancillary works
To construct extension to gable / rear of existing dwelling house, plus all ancillary site works
Of the domestic garage together with all associated site development works, boundaries and services
For the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
Of the following development consisting of the replacement 3 No existing Velux windows on the front elevation with a flat roof dormer window to dwelling
For the construction of an extension to the existing dwelling and associated site works
To construct a granny flat to the side of an existing dwelling house along with all associated works
Of the first floor area of house No 2A (Planning Ref No P03/612)
Of existing extension and alterations to the existing retail premises
For change of use of existing ground floor storage area to office space with all necessary ancillary works at their headquarters
To construct dwelling house, garage, carport with loft, treatment system and provide new entrance to public road
Of the following a) the front porch and rear extension along with additional window/rooflight and changes to windows of the dwelling house. b) first floor storage area and additional windows/door/rooflights of the garage along with associated site works
For demolition of outbuilding and existing extension, refurbishment and alterations of existing dwelling house and construction of a new extension, car port and outbuildings along with all associated works
Of the roof finish and alterations to the front boundary wall along with associated site works
Of the existing outbuildings/structures and site entrance along with associated site works
To construct a new dwelling house, private garage, site entrance and on-site sewerage treatment system along with all associated site works and services
To construct a new dwelling house, new entrance, garage, connection to public sewerage and water services and all associated works
To install a proprietary wastewater treatment system along with ancillary site works
For development which will consist of (a) Before school breakfast club 8 -9 am (b) Playschool 9-12 noon (c) Preschool after care 12-1 pm (d) After school care 1-5.30pm
The development consist of 1) Retaining Playschool in meeting room number two; 2) Changing meeting room number one into a playschool c/w ancillary site works
Of the dwelling and boundary wall as built on site, which differ to that granted under ref 20/219 & all other associated site and ancillary works
To build a new dwelling house, install a waste treatment system and all associated site and ancillary works
For a change of house design. The development will consist of the modification of the existing Planning Application 17/590 (grant date 28.01.2018). Modification to consist of demolition of existing outbuildings to side of house and a new extension in their place. This extension will provide a sitting room over and above the provisions already outlined in 17/590, namely the demolition of flat roof extension to rear of house, new extension and provision of waste water treatment system, and associated site works