For (1) Demolish existing Storage Building (2) Construction of a 4 Bay Slatted Shed with underground slurry storage tank along with all associated site works. Gross floor space of proposed works: 286.08 sqm. Gross floor space of any demolition: 57.79 sqmDecision record indexed
Retention of garage and change of use from garage to granny flat, upgrading of onsite wastewater treatment system and ancillary worksGrounds not yet categorised
To construct a new dwelling, septic tank, treatment system, percolation area and all associated works. Gross floor space of proposed works: 258 sqmGrounds not yet categorised
'Lakeside' Castletown, Cross, Claremorris Co. Mayo
RETENTION OF A HABITABLE USE AT FIRST FLOOR LEVEL, THE ADDITION OF 2 ROOFLIGHTS ON THE FRONT OF THE EXISTING DWELLING, AN ADDITIONAL STEEL SHED TO THE REAR OF THE EXISTING DWELLING AND ALL ANCILLARY WORKS. PREVIOUS PLANNING REFERENCES P98/1004, P03/2067 AND P05/2306 RELATE TO THE ORIGINAL PROPERTY.Decision record indexed
To construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area. Gross floor space of proposed works: 189 sqm (house)Decision record indexed
REMOVING THE EXISTING SEPTIC TANK SYSTEM SERVING THE DWELLING HOUSE AND IN ITS PLACE TO INSTALL A NEW WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ANCILLARY WORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY REAR AND SIDE EXTENSION TO EXISTING DWELLING HOUSE, CONSTRUCTION OF GARAGE, NEW ON SITE WASTEWATER TREATMENT SYSTEM, ALTERATIONS TO EXISTING SITE LAYOUT AND ANCILLARY WORKSDecision record indexed
RETENTION OF RECENTLY DRILLED BOREHOLE PLUS PERMISSION FOR A NEW SINGLE STOREY TREATMENT PLANT BUILDING. AN APPROPRIATE ASSESSMENT SCREENING REPORT AND A HYDROGEOLOGICAL REPORT IS SUBMITTED.Grounds not yet categorised
To operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third Schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life vehicles (other than end-of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment an recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006).Grounds not yet categorised
Of extension to the rear of the existing shed (granted under historical planning Ref No 57783) on a site with revision of boundaries from that previously granted under historical planning Ref No 33420. For provision of a new site entrance, new front boundary wall set back 3m from the existing road edge along the entire frontage of the additional site extension, to operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life veh2qAQicles (other than end -of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-Of-Life Vehicles) Regulations 2006 (S.I No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-Of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006). Treatment system / septic tank, percolation area and all ancillary site development works. Gross floor space of work to be retained: 78 sqmGrounds not yet categorised
To construct a fully serviced dwelling house, a treatment plant system plus a garage and to relocate the front boundary wall so to obtain the required site distances. Gross floor space of proposed works: 168.00 sqm(H), 54.00 sqm(G)Decision record indexed
To construct dwelling house, garage, treatment plant and polishing filter and associated services. Gross floor space of proposed works: Dwelling: 216sqm, Garage: 60sqm.Grounds not yet categorised
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
For dwelling house, separate domestic garage/shed, septic tank/effluent treatment unit & percolation area/polishing filter and all associated services. A Natura Impact Statement has been prepared as part of this planning application. Gross floor space of proposed works: House 134.64 sqm & Garage 46.97 sqmDecision record indexed
For the construction of a side and rear extension to an existing dwelling including elevation alterations. Permission is also sought for the replacement of the existing septic tank with a new proprietary treatment system and percolation area and for all ancillary services and site works. Gross floor space of proposed works: 72 sqmDecision record indexed
RETENTION FOR A DOMESTIC GARAGE AND A DOMESTIC FUEL STORE SHED AND ALL ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING SERVICESDecision record indexed
For the construction of a dwelling house, treatment unit, percolation area and all associated site services, Gross floor space of proposed works; 337sqmDecision record indexed
To construct a fully serviced dwellinghouse, a garage & an effluent treatment plant system that includes a raised percolation area. Also permission to relocate the front boundary wall so to obtain the required sightlinesDecision record indexed
To construct a serviced dwelling with effluent treatment system and garage/shed. Gross floor space of proposed works: 210 sqm (house) & 50 sqm (garage)Decision record indexed
Construction of a dwelling house, domestic garage, construction of a new proprietary sewage treatment system and all associated works at the above addressDecision record indexed
Construction of a dwelling house, domestic garage, proprietary wastewater treatment system and all associated works at the above addressDecision record indexed
For development consisting of the construction of a new two storey dwelling house and garage with proprietary treatment system and percolation area along with all associated site works. Gross floor space of proposed works: 279 sqmDecision record indexed
For the construction of a two storey, serviced dwelling house with a domestic store / garage. Gross floor space of proposed development: 231 msq [h] & 52.1 msq [g]Decision record indexed
Of "as constructed" serviced dwelling house on revised site boundaries (previous planning ref. no.29650) and permission for retention of domestic garage/store. Gross floor space of work to be retained: House - 210 sqm, Garage - 37 sqmDecision record indexed
To construct a dwelling house and wastewater treatment system and all associated works. Gross floor space of proposed works: 244.9 sqm.Decision record indexed
To retain a dwelling house, garage, effluent treatment system and percolation area on revised boundaries as constructed at Cave townland, Caherlistrane, Tuam, Co. Galway. Gross floor space of work to be retained: 352.67 sqmDecision record indexed
CONSTRUCT A PRIVATE DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
For the construction of a new dwelling house, domestic garage, sewage treatment plant and percolation area, along with all ancillary works. Gross floor space of proposed works: 168 sqm (house) & 50 sqm (garage)Decision record indexed
Retention planning permission at this site is being sought for the following development: To retain a conservatory extension to the side elevation of existing dwelling house and to retain an existing boat house constructed on site.Decision record indexed
To construct dwelling house, garage, treatment system and percolation area and associated services. Gross floor space of proposed works is; dwelling 199 sqm & garage 60 sqm.Decision record indexed
To retain an existing dwelling and garage / shed and an extension and alterations to an existing dwelling and upgrade of an effluent treatment system. Gross floor space of proposed works: 160 sqm. Gross floor space of work to be retained: 178 sqm (dwelling) & 64.7 sqm (garage)Decision record indexed
And completion of dwelling house with amendments to design granted under pl. ref. 21/856, (2) relocation of proposed garage granted under pl. ref. 21/856, (3) temporary mobile home with temporary connection to existing wastewater treatment plant along with all ancillary worksDecision record indexed
To renovate existing thatched cottage (Protected Structure RPS 4008), demolish existing extension to cottage, construct a new extension to rear of existing cottage and a new treatment plant and associated site services. Gross floor space of proposed works: 51.00 sqm(extension), 78.00 sqm(house). Gross floor space of demolition: 27sqmDecision record indexed
To replace existing conservatory with a new sun room and to create a en-suite overhead at the first floor level. Gross floor space of proposed works: 26 sqm. Gross floor space of any demolition: 12.96 sqmDecision record indexed
To construct a dwellinghouse, garage and associated services. Gross floor space of proposed works: Dwelling: 64 sqm, Garage: 25.50 sqmDecision record indexed