To RETAIN alterations to an existing office building and permission to construct a new equipment storage building containing office space.
To restore, refurbish & extend an existing derelict dwelling and outbuilding, installation of new sewerage treatment system, construct new entrance walls, along with all associated works
For change of use of premises from former shop to proposed pizzeria/takeaway
To RETAIN development consisting of attic conversion c/w velux windows and associated site works
To construct an extension to the west side of an existing dwelling house and alterations to the front porch including widening the front door and removing side windows, along with ancillary works
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt
To construct a new external refrigeration plant area enclosure with associated pipe arbour to the west side of the existing Aldi store with all associated site works
Of the following development: (a) alterations to the existing dwelling house; (b) conversion of shed to use as part of house, including connection to the house; (c) construction of new shed to rear; (d) all associated site works and services
For development to demolish section of existing agricultural building and to construct livestock slatted unit plus a cubicle shed with associated ancillary site works.
To renovate and extend exiting structurally impaired dwelling house, with works to include part demolition and all necessary ancillary services
To (a) replace existing flat roof and parapet with new low pitch roof over existing dwellings/ structures, (b) PERMISSION to demolish part of existing rear wall (facing into yard) and replace with new wall in same location, all within existing site boundaries. Please note that the development site is located within the Kilrush architectural conservation area
For the development which consists of the construction of a slatted unit and associated site works
For development, the development consists of the construction of a slatted unit and associated site works
To convert and extend existing Convent structures, to upgrade existing stairways, relocate part of internal partitions, install 2No lifts, revise floor levels, revise part elevations, to include 30No apartments, to demolish part of existing outbuilding, reduce part of ground levels, to construct 20No semi-detached dwellings, service road, new entrance and to upgrade/ extend existing ancillary services. The Convent is a protected structure (RPS 861)
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To decommission existing septic tank system and upgrade to proprietary wastewater treatment plant with percolation area and PERMISSION to RETAIN the following; 1. Extension as constructed to rear of existing dwelling. 2. Music/ Art studio building as converted from existing out offices. 3. Riverside gazebo as constructed. 4. Concrete base as constructed
Of the following: front, rear and gable extensions to existing dwelling with minor elevational changes, 2 No. existing domestic sheds, front boundary/access treatment plus all ancillary site works
For change of use of existing vacant commercial unit to a restaurant/café and to erect signage along with all associated works
To construct 4 no. terraced house to the rear of the existing building and all ancillary and incidental works. The houses will consist of 2 bedrooms, kitchen, living area, bathroom and storage including bin storage
Of as-constructed ground floor bay window and PERMISSION for alterations to first floor windows on front elevation
To demolish existing shed at rear of house and construct new single storey extension to rear of dwelling
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
For change of use of an existing vacant retail unit to a takeaway/restaurant and to erect new signage along with all associated works
(1) Retention permission for the demolition of a derelict shed, (2) Retention permission for the construction of the foundation, walls and associated works completed to date and (3) planning permission to complete the construction of the proposed shed along with all associated works.
1. Planning PERMISSION to demolish a substandard dwelling house and reconstruct a new dwelling house and install a new wastewater treatment system, new front boundary and entrance walls and associated works. 2. RETENTION PERMISSION for the construction of the foundation, walls and associated works of a private garage competed to date. 3. Planning PERMISSION to complete the construction of the proposed private garage which will be used as ancillary to the proposed new dwelling house along with all associated site works
For construction of a new dwelling house, garage, sewerage treatment system and site entrance along with all associated works
Of the altered domestic garage, converted for use as a detached ancillary residential unit for the enjoyment of the occupants of the main dwelling on site, PERMISSION to upgrade the existing septic tank & all other associated site and ancillary works
To construct new bay window and porch to front elevation
For change of use of the current commercial unit to residential use with all necessary ancillary services
To alter, renovate and extend an existing cottage and outbuilding, and install a new wastewater treatment system along with all associated works
The development will consist of the change of use from school to domestic dwelling, with replacement doors and windows and new windows and door where shown
For change of use of ground floor retail unit to a one bedroom apartment with alterations to elevations, internal changes along with all associated site works and services
Of minor elevational alterations and planning PERMISSION to erect additional walling to the front of the dwelling and erect entrance gates to the front of the property along with all associated works
For the change of use of a former schoolhouse - currently designated as residential - to a short term let facility
For change of use of ground floor, retail unit to a one bedroom apartment with alterations to elevations, internal changes along with all associated site works and services
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To build a new dwelling house, garage, install a wastewater treatment system & all other site and ancillary works
To construct a Storage Shed along with ancillary site works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
For change of use of the current commercial unit to residential use with all necessary ancillary services
The development will consist of construction of an agricultural shed with cubicles, underground slatted slurry and soiled water storage tanks, milking parlour, dairy and plant room and relocation of external feed bin and all associated site works.
For change of use of ground floor commercial unit into a one bedroom apartment with alterations to front and side elevations, internal layout changes, and all ancillary site works and services
For development of a livestock slatted unit, manure pit, horse stables with fenced sand arena, ancillary concrete and associated site works
To carry out the following development. The construction of a new housing estate development consisting of: a) 12 no. residential units comprising of: a) 2 no. 1-bedroom, single storey houses, ie. Type A 2 no. - 2-bedroom, single storey houses, i.e. Type B 8 no. 2-Bedroom two Storey houses, i.e Type C b) 16 ancillary car parking spaces within the development. c) The construction of pedestrian access point to the site. d) New vehicular access point to the site. e) Connection to main sewer and watermain. f) Alterations to ground level to accommodate the development. g) Surface water management will include attenuation and discharge to surface water network. h) All ancillary site works to include boundary and landscaping works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. A preliminary examination of the nature, size and location of the development has been carried out to Article 120(1) of the Planning & Development Regulations, 2001 (as amended) and it has been concluded that there is no likeilhood of significant effects on the environment arising from the proposed development and, accordingly, an Environmental Impact Assessment is not required.
To build a Dwelling House, install a wastewater treatment system & all other associated site and ancillary works
To construct a rear entrance gate to property
For change of use of existing private garage to a parish administration office and to extend and develop same with all necessary ancillary works
To construct two extensions to their existing dwelling house along with ancillary site works
To construct bay window to the front of existing dwellinghouse plus all ancillary site works
For construction of a new dwelling house, garage, sewerage treatment system and site entrance along with all associated works