CONSTRUCT DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES.Decision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH GARAGE AND AN EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Planning Permission to construct dwelling house, garage and foul effluent treatment system all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
The development will consist of a dwelling house and garage with tertiary treatment system and filtration/ treatment area on site together with all ancillary site works and services.Grounds not yet categorised
THE DEVELOPMENT CONSISTS OF (1) THE RETENTION OF THE GARAGE AS CONSTRUCTED (106.2M2), (2) REAR HOUSE EXTENSION AT GROUND AND FIRST FLOOR (18.52M2), (3) ALTERATION TO HOUSE RIDGE LINE, ROOF AND WINDOW FENESTRATIONS AS CONSTRUCTED, (4) UPGRADE OF WASTEWATER TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS.Decision record indexed
SINGLE STOREY DWELLING HOUSE, DOMESTIC GARAGE, BOUNDARY FENCING/TREATMENT AND SEPTIC SYSTEM, COMPLETE WITH ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
THE DEVELOPMENT CONSISTS OF THE CONSTRUCTION OF A NEW DWELLING HOUSE (221.4M2) WITH INTEGRATED GARAGE (45.4M2), NEW SEPTIC TANK SYSTEM AND CONNECTIONS TO THE PUBLIC WATER TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKSDecision record indexed
Planning Permission to extend dwelling house and alter elevations, extend garage and alter elevations, construct office, upgrade foul treatment system, and relocate entrance all as per drawing documentation submitted together with all ancillary site works and servicesDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA, ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
MOVING THE PROPOSED DEVELOPMENT BACK 6 METERS FROM ORIGINALLY GRANTED AND RAISING THE FINISHED FLOOR LEVEL TO 81.400 TO MATCH NEW SITE POSITION.Decision record indexed
INSTALLATION OF A 50kW PHOTOVOLTAIC (PV) PANEL SYSTEM ON EXISTING ROOF, IN ACCORDANCE WITH DOCUMENTS LODGED, INCLUDING ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Planning Permission to construct a dwelling house and domestic garage and all associated site works. ( House 132? + Garage 28? )Decision record indexed
THE DEVELOPMENT CONSISTS OF THE RENOVATION OF THE EXISTING DWELLINGHOUSE TOGETHER WITH A TWO-STOREY EXTENSION TO THE SIDE AND REAR, AN INTEGRATED DOUBLE GARAGE, AN UPGRADE OF THE SEPTIC TANK SYSTEM AND ALL ASSOCIATE ANCILLARY SITE WORKS.Decision record indexed
Retention of existing stone filling and the retention of existing mobile home, construction of a dwelling house, domestic garage, proprietary treatment unit and percolation area and all ancillary worksGrounds not yet categorised
Construct a dwelling house type and septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
CONSTRUCT A PRIVATE DWELLING HOUSE WITH ATTACHED GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Retain dwelling house on revised site boundaries, and to install a packaged wastewater treatment system and soil polishing filter, together with all ancillary site works and servicesDecision record indexed
DEMOLISH EXISTING DWELLING HOUSE AND STORAGE SHED AND CONSTRUCT NEW DWELLING HOUSE AND DOMESTIC GARAGE ALONG WITH ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH DETACHED GARAGE AND PROVISION OF PACKAGED WASTEWATER TREATMENT SYSTEM, POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
RETENTION OF EXISTING DOMESTIC GARAGE AS BUILT, RETENTION OF EXISTING DWELLING HOUSE AS BUILT, ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE ALONG WITH ANCILLARY SITE WORKSDecision record indexed
Townlands of Knockaunacat Erriff Derrymore Bohogerawer, Townlands of Gorteen Hazelwood, Townlands of Cloonbullig Drumbaun
Laying of a 150mm diameter Underground Discharge Pipe, 5.2km in length, containing fully-treated effluent from Existing Factory at Western Brand Chickens, Knockaunacat to the Existing Fully-Licensed Above-Ground Effluent Balance Tanks at Drumbaun and final discharge pipe to the Dalgan River located at Cloonbullig. The proposed discharge pipe passes along the public road through the townlands of Knockaunacat, Erriff, Derrymore, Bohogerawer, Gorteen, Hazelhill, Cloonbullig and Drumbaun together with all ancillary site works and services at the above addresses. The proposed pipe shall replace the transporting of the fully-treated effluent from Western Brand Chickens, Knockaunacat to the Full-Licensed Above-Ground Effluent Balance Tanks at Drumbaun by Tanker Trucks as per granted under Planning permission P21/869.Decision record indexed
Upgrades to the existing Claremorris Wastewater Treatment Plant comprising: Installation of a new inlet works including an inlet flume, duty/assist screens, bypass screen and a grit removal infrastructure; Installation of a new selector tank; Upgrades to the existing aeration system; Installation of a new final settlement tank; Upgrades to the existing RAS/WAS pumping station; Installation of a new picket fence thickener; Installation of a new sludge dewatering unit within the control building; Installation of a new final effluent pumping station; Upgrades to the existing outfall pipeline; New surface water outfall and petrol interceptor; Ancillary mechanical and electrical upgrades; and Associated ancillary site worksDecision record indexed
INTERIOR ALTERATIONS TO PORCH AND ENTRY OF EXISTING CHURCH, A PROTECTED STRUCTURE RPS#135, TOGETHER WITH ALL ANCILLARY AND ASSOCIATED WORKSDecision record indexed
Retention permission for the relocation of existing dwelling house as constructed and the relocation of site entrance along with all associated site development works, from that previously approved under planning Ref. No. 03/2596Decision record indexed
Retain as built dwelling house, garage and shed (dwelling house previously granted planning permission under P94/443) together with all ancillary site works and servicesDecision record indexed
Retention permission for the dwelling house as constructed, previous planning reference no. P75/162, along with all ancillary site worksDecision record indexed
THE REPLACEMENT OF APPROX. 291M OF EXISTING 2.4M HIGH CHAINLINK FENCING AND ASSOCIATED GATES WITH 291M OF NEW 2.4 HIGH GREEN PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS AT AN EXISTING ABOVE GROUND NATURAL GAS INSTALLATIONDecision record indexed