To construct new dwelling including garage, proposed site entrance, proposed treatment unit and percolation area, including all ancillary site works
To RETAIN the front wall and gate as constructed and planning PERMISSION to complete the front wall and for an extension and refurbishment of an existing dwelling house along with all associated works
To part demolish existing downstairs bedroom for development of new universal bedroom and en-suite bathroom with all necessary ancillary works
For the demolition of a pyrite-damaged two-storey extension to the rear of the existing dwelling and the construction of a wider two-storey extension, the removal of part of the front porch, the installation of a wheelchair-accessible ramp, internal alterations, and all associated siteworks
To replace the existing substandard dwelling with a new dwelling, using existing connections to services and all associated site and ancillary works
To carry out alterations and extension to an existing dwelling house, removal of part of the front boundary wall to facilitate safe parking, along with all associated works
To carry out alterations to existing dwelling house, the works will consist of the construction of zinc clad box dormers, to the front and rear elevations of the property, to increase the first floor living space
To Extend the Appropriate Period of Planning Permission for P15-557 to replace previously granted block OF 5 No. apartments Ref No. 08-31001, with block of 3 No dwellings and ancillary services
To construct three dwelling houses along with all ancillary works
For alterations to the front façade of 2 no. residential properties, which comprise of: a) the proposal to reposition entrance doorway, b) enlargement of the ground floor window, c) the addition of raised plaster mouldings to the first floor window surrounds at 2 Cappa Village, d) the installation of a new shopfront spanning both properties, encompassing existing entrance doorway at 1 Cappa Village, entrance doorway and window at 2 Cappa Village, and including all ancillary site works
For the construction of 4 dwelling houses incorporating garages, new entrance and access road, connection to water and sewerage facilities along with all associated works
For change of use/conversion of existing Domestic Garage to Granny Flat/Independent Living Accommodation Unit, plus all ancillary site works
To RETAIN the construction of a small garden shed and planning PERMISSION to carry out alterations to existing dwelling house, including raising the height of their dwelling along with all associated works
To RETAIN: 1. The house as built on site, which is a mirror image of that granted under reference P98/1903; 2 The attached Garage and Rear Porch and 3. The Detached Steeltech Storage Shed and for PERMISSION to revise the Boundaries granted under P98/1903 and all associated site and ancillary works
Of front porch/extension to existing dwelling house plus all ancillary site works
To construct a new semi-detached dwelling house to the side of the existing dwelling house, to include revision of the existing site boundaries along with all associated site works and services
To extend existing dwelling house, install foul sewerage treatment plant and percolation area
For the alteration and enlargement of 2 no. existing windows and the construction of 1 no. new roof light
To construct a new dwelling house, garage, entrance/exit, boundary walls, connection to public water & sewage system and all other ancillary site works
Of the existing unauthorised extensions to the side and front of the existing dwelling house with all necessary ancillary services
For alterations to the existing domestic garage and planning PERMISSION to make further alterations and to convert the garage to a granny flat along with all associated works
To convert and extend existing Convent structures, to upgrade existing stairways, relocate part of internal partitions, install 2No lifts, revise floor levels, revise part elevations, to include 30No apartments, to demolish part of existing outbuilding, reduce part of ground levels, to construct 20No semi-detached dwellings, service road, new entrance and to upgrade/ extend existing ancillary services. The Convent is a protected structure (RPS 861)
For the following development to two no dwelling houses. 1) to RETAIN the attic conversions to residential accommodation to both residential units. 2 to RETAIN the changes to current site boundaries and to RETAIN the increased ground levels which differ from those previously authorised under Planning Permission P07-31028
To construct a first floor extension to an existing house along with all associated works
To demolish existing shed and PERMISSION to construct new front porch and single-storey rear extension, including all ancillary site works
For the removal of an existing garage and link, refurbishment of an existing dwelling house, construction of extensions & garage along with all associated works
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For development which will consist for the refurbishment works to an existing cottage to include raising the roof level, the construction of a single storey extension to the side and rear of the existing cottage, the installation of a new wastewater treatment system and all associated site works
To replace the existing 15m high monopole telecommunications support structure with a 21m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment enclosed by security fencing
To construct new dwelling, connect to existing public sewer and water services, including all ancillary site works, utilising existing entrance location onto public road
To construct new shed / store, and permission to RETAIN revised as-built elevation (as per previous planning ref P20-565)
To install a passenger lift to the rear of merchants quay building and to install roof lights on existing roof structure. This development is located in Protected structure RPS Number 858 (Quay Mills).
To carry out works within the confines of Kilrush Sport Complex, Ballyurra Td, Cooraclare Road, Kilrush Co Clare. The works involve the following: I. To upgrade the existing changing room building. This will consist of shower areas, changing rooms, toilets, services area and accessible changing area, replace existing roof with new. ii. To provide new extension and link section connecting to upgraded changing rooms. The new extension will consist of changing rooms, shower areas, toilets, officials changing room, boiler/services area and maintenance shed. iii. To connect the upgraded changing rooms and proposed extension unit to existing site services. iv. All associated site works pertaining to the upgraded changing area and proposed extension. In accordance with the habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To RETAIN alterations to an existing office building and permission to construct a new equipment storage building containing office space.
Of as-built partially constructed extension and Planning Permission for the subdivision of the existing site to form a separate independent dwelling, to complete the refurbishment & extension, construction of boundary walls including forming a new street level entrance along with all associated works. Kilrush House is a protected structure (RPS No 859)
To install additional windows on the western elevation, to carry out alterations to the existing roof of the dwelling, install 2 number dormer windows on the front elevation & reopen stone arches previously build up, install entrance gates along with all associated works Kilrush House is a protected structure (RPS No 859)
For change of use of existing vacant commercial unit to a restaurant/cafe incorporating takeaway, external seating, and canopy along with all associated works. This development is located in Protected structure RPS Number 858 (Quay Mills)
To retain: (A) the construction of one dormer window in lieu of the 2 dormer windows granted under P20-63, (B) retaining the stone infill to the arch which was proposed to be opened under P20-63 and Planning Permission for (1) construction of an extension to the existing dwelling house, bin storage, storage sheds (2) minor alterations to part of the existing building to integrate the new extension (3) construction of 1 standalone storage shed, (4) construction of a garden room (5) construction of a covered carport with solar panels and (6) all associated ancillary works. Kilrush House is a protected structure RPS No. 859
To install solar panels on the roof of the existing house along with all associated works. The Monastery is a Protected Structure RPS No. 860.
To RETAIN and Complete changes to the design previously authorised under planning permission P23/574 with all necessary ancillary services
To construct front and rear extensions to existing dwelling house plus all ancillary site works
To renovate and extend the existing dwelling house with all necessary ancillary services
Of extensions and alterations to the existing retail outlet, storage containers, signage, elevational changes, the erection of a shopping trolley bay, along with all associated ancillary works and planning PERMISSION for the change of use of a portion of the existing retail floor to post office kiosks
For change of use of existing private garage to a parish administration office and to extend and develop same with all necessary ancillary works
To construct 42 no. dwelling houses comprising 2 no. 4 bedroom detached houses, 16 no. 4 bedroom semi-detached houses, 10 no. 3 bedroom semi-detached houses, 6 no. 3 bedroom terraced houses, 4 no. 2 bedroom semi-detached bungalows, 2 no. 2 bedroom duplex units, 2 no. 3 bedroom duplex units and all associated site works and services. A Natura Impact Statement (NIS) has been included in this application
For 1. the change of use of an existing activity centre and store buildings into 6 no. ground floor short term accommodation units, 2. to alter the elevations of the existing building, 3. modification to the parking layout, 4. lower an existing stone wall on the northern boundary and erection of steel fencing and gates and, 5. to install a canopy and outdoor seating area to the existing restaurant along with all associated works
To renovate, alter and extend an existing dwelling house along with all associated works
To RETAIN the installation of a roof light to the front of their existing dwelling along with all associated works
For the following: to replace existing flat roof over rear extension with new raised flat roof, relocate existing rear wall of extension, revise rear and side elevations of extension, including permission to re-locate existing side access gate, including all ancillary site works
To carry out the following development. The construction of a new housing estate development consisting of: a) 12 no. residential units comprising of: a) 2 no. 1-bedroom, single storey houses, ie. Type A 2 no. - 2-bedroom, single storey houses, i.e. Type B 8 no. 2-Bedroom two Storey houses, i.e Type C b) 16 ancillary car parking spaces within the development. c) The construction of pedestrian access point to the site. d) New vehicular access point to the site. e) Connection to main sewer and watermain. f) Alterations to ground level to accommodate the development. g) Surface water management will include attenuation and discharge to surface water network. h) All ancillary site works to include boundary and landscaping works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. A preliminary examination of the nature, size and location of the development has been carried out to Article 120(1) of the Planning & Development Regulations, 2001 (as amended) and it has been concluded that there is no likeilhood of significant effects on the environment arising from the proposed development and, accordingly, an Environmental Impact Assessment is not required.