Of upper floor garage
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
For the construction of a dwellinghouse, garage, entrance & proprietary waste treatment plant including all ancillary site works
To construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
To Extend the Appropriate Period of Planning Permission for P15-640 to restore, refurbish and extend existing farm dwelling house install waste water treatment system percolation area, and all associated site works.
For a two storey dwelling house, detached garage, waste water treatment system, vehicular entrance, and ancillary site works
The development consists of the construction of a slatted unit and associated site works
For development, the development consists of the construction of a slatted cubicle unit and associated site works
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
To construct dwelling house, septic tank, percolation area and new site entrance
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
To RETAIN the construction of lean- to extension to side of garage & extension to rear of garage to include roof area, boiler house, balcony and retention permission for alteration of position of treatment plant and percolation from that approved under P03-1728, including ancillary site works.
To construct an entrance, dwelling house, garage, wastewater treatment system with soil polishing filter together with all associated site development works and services
To extend existing derelict house and store to include living-kitchen-dining area, 4No bedrooms, bathroom and to install foul sewer treatment plant and percolation area
To demolish an existing Industrial building and associated works on site and to construct a dwelling house and garage, with effluent treatment system, with all associated site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the installation of a domestic waste water treatment system with polishing filter to serve existing house together with all associated siteworks
To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works
To remove an existing greenhouse superstructure and to construct a new greenhouse, restore and rebuild an existing outbuilding structure and to reroof in part, all located close to protected structure ref RPS no. 640.
To repair and reroof an existing outbuilding located close to protected structure (ref RPS no. 640)
For (a) to refurbish and reroof and for a change of use of an existing outbuilding from storage use to accommodation use ancillary to the existing house, and to construct a new extension and (b) To refurbish and reroof an existing barn to include a roof mounted PV solar array, and to construct a new glass house and ESB switch room/ services building, all located close to a protected structure ref RPS no. 640.
To a) demolish existing conservatory b) construct rear extension together with all ancillary site development works and services
For development which will consist of the construction of an agricultural loose house and associated site works
To construct a new dwelling house and garage complete with an access road, sewage treatment system and ancillary works
To construct a new two storey four bedroom dwelling house, together with a detached garage, new site entrance and on-site wastewater treatment system along with all other associated site works and services
To extend existing slatted unit and yard, to erect new slatted unit, 3 No stables, storage areas, machinery shed + canopy for farm equipment and to RETAIN upgraded entrance road and yard
Of dwelling house and associated site development works as constructed, including all minor variations and deviations from the plans and conditions of Planning Permission Ref. P8/16627
The development consists of the construction of a new slatted cubicle house and associated site works
To alter the design of the dwelling house granted under planning application P18/729
To construct an agricultural storage barn including all ancillary site works and services
To construct a dwelling house, separate garage, site entrance, sewer treatment unit with percolation area including all ancillary site works as previously granted under Planning Application P13-39
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
For the construction of a two-storey extension to the rear of the existing dwelling, the construction of a single-storey extension to the side of the existing dwelling, the removal of existing extensions to the side and rear of the existing dwelling, the replacement of existing windows and associated site works
To retain (x2) sheds to the rear of the dwelling house
To Extend the Appropriate Period of Planning Permission for P16-575 to construct a dwelling house, entrance, wastewater treatment system and all ancillary site works
Of a single storey kitchen extension and sheds to the rear of property
For the following works: to replace the twin/movable modular toilet units with temporary modular units to include toilet and changing rooms units
For the refurbishment of existing derelict dwelling and for the construction of an extension to same to comprise of kitchen/dining, bathroom and en-suite including ancillary site works
The development will consist of a dwelling house with proprietary wastewater treatment system & polishing filter together with ancillary site works
To construct a dwelling house and proprietary waste water treatment system along with ancillary site works
For development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
For the refurbishment of an existing derelict cottage, construction of an extension and construction of a new private garage along with all associated works
To RETAIN and complete dwelling house as constructed to date and construct garage. Connect to existing proprietary waste water treatment system. Connect to Lissycasey Group Water Scheme and public services and carry out all ancillary site works
To construct a new dwelling house and garage, complete with a new entrance, sewage treatment system and ancillary works
To install an Ancillary Living Unit, connections to services and all ancillary site works