(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 149.38 (B) THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA (C) AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE (2) DEVELOPMENT OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE (3) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSGrounds not yet categorised
(A) CONVERSION AND USE OF ATTIC SPACE AS DOMESTIC HABITABLE ACCOMMODATION (B) EXTENSION TO THE FRONT PORCH AND TO THE REAR PROJECTION (C) ALTERATIONS TO THE FENESTRATION OF THE DWELLING AND GARAGE WHICH INCLUDES ADDITIONAL ROOFLIGHTS AND WINDOWSDecision record indexed
TOWNLANDS OF FAIAFANNAN & CUNLIN, 3.5KM NORTH OF KILLYBEGS HARBOUR, CO DONEGAL
10 YEAR PLANNING PERMISSION WHICH WILL CONSIST OF (1) UPGRADING OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION OF APPROXIMATELY 1.2KM OF NEW ACCESS TRACKS AND NEW SITE ENTRANCE, AND (3) CONSTRUCTION OF A 5.5M SPAN TEMPORARY BRIDGE AND ASSOCIATED ANCILLARY INFRASTRUCTUREGrounds not yet categorised
ELEVATIONAL AMENDMENTS TO DWELLING HOUSE PREVIOUSLY GRANTED UNDER REF. NO. 02/2848 AND PERMISSION FOR (1) DEMOLITION OF (A) EXISTING DEFECTIVE CONCRETE BLOCK DWELLING AND DOMESTIC GARAGE AND (B) ADDITIONAL DWELLING ON THE SITE AND (2) CONSTRUCTION OF A SINGLE REPLACEMENT DWELLING WITH REDUCED FINISHED FLOOR LEVEL TOGETHER WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF AN EXTENSION TO DWELLING HOUSE TO INCLUDE ENLARGING THE KITCHEN WITH SUNROOM ON THE GROUND FLOOR AND ENLARGING A BEDROOM ON THE FIRST FLOOR INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) AGRICULTURAL SHED (2) INSTALLATION OF A REPLACEMENT SEPTIC TANK SERVING EXISTING DWELLING HOUSE INCLUDING ALL ASSOCIATED SITE WORKS AND PERMISSION FOR (1) ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE INCORPORATING THE DEMOLITION OF EXISTING BARN TO ACCOMMODATE SAME (2) INSTALLATION OF A PERCOLATION AREA TO SERVE EXISTING SEPTIC TANK INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, (C) PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE, (D) CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSDecision record indexed
(1) DEMOLITION OF EXISTING HABITABLE DWELLING AND DECOMMISSIONING OF EXISTING SEPTIC TANK (2) CONSTRUCTION OF REPLACEMENT DWELLING WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM (3) DEVELOPMENT OF NEW SITE ENTRANCE\ACCESS ROAD INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
(1) CONSTRUCTION OF SINGLE STOREY INFILL EXTENSION BETWEEN THE REAR OF THE HOUSE AND THE EXISTING SHED TO CONTAIN A GARAGE & A FUEL STORE (2) CONNECTION TO EXISTING FOUL & SURFACE DRAINAGE ON SITE AND (3) ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE WITH PREPARATORY WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) EXISTING HOUSE AS BUILT AND PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 05/2796 AND PERMISSION FOR (2) DEMOLITION OF THE EXISTING STOREY AND A HALF DWELLING HOUSE WITH ANCILLARY FAMILY ACCOMMODATION DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS, (3) RECONSTRUCTION OF A NEW STOREY AND A HALF HOUSE WITH ANCILLARY FAMILY ACCOMMODATION WITH ALTERATIONS FROM THAT OF THE EXISTING DWELLING HOUSE. THE RELEVANT REPLACEMENT WORKS WILL BE CONNECTED TO THE EXISTING SITE SERVICESDecision record indexed
(1) CONSTRUCTION OF AN EXTENSION AND RENOVATIONS TO THE EXISTING DWELLING HOUSE INCLUDING REVISED RAISED RIDGE HEIGHT AND (2) RENOVATIONS TO AN EXISTING SHED TO PROVIDE ANCILLARY INDEPENDENT LIVING SPACE, AND ASSOCIATED WORKSDecision record indexed
DEVELOPMENT TO EXISTING DWELLING HOUSE CONSISTING OF: (1) RENOVATION AND ALTERATION WORKS INCLUDING THE DEVELOPMENT OF A REVISED PITCHED ROOF DESIGN AND AMENDMENTS TO DOOR AND WINDOW OPENINGS, (2) CONSTRUCTION OF AN EXTENSION TO THE REAR ELEVATION INCLUDING DEVELOPMENT OF FIRST FLOOR ACCOMMODATION OVER PART OF EXISTING AND (3) INSTALLATION OF SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
INSTALLATION OF 3 NO. 1 BEDROOM GLAMPING PODS SERVED BY THE EXISTING FACILITIES ASSOCIATED WITH ADJACENT COMMUNITY CENTRE BUILDING, SERVICES AND SITE WORKSDecision record indexed
(1) CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY GRANTED UNDER PLANNING REF. 19/51646 (2) CONSTRUCTION OF A DOMESTIC GARAGE TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
EXISTING DWELLING BASE AND WALLS INCLUDING EXISTING SITE WORKS AND PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) CHANGE OF USE OF INDUSTRIAL SAWMILL TO A 16 BEDROOM TOURIST ACCOMMODATION FACILITY (2) CHANGE OF USE OF EXISTING DETACHED OFFICE TO COFFEE SHOP/SHOP (3) CONSTRUCTION OF 7 TWO-BED CABINS (4) CAR PARKING AND ASSOCIATED HARDSTANDING (5) TERTIARY WASTEWATER TREATMENT SYSTEM (WWTS) IN COMBINATION WITH SAND POLISHING FILTER (6) LANDSCAPING WALK INCLUDING A PEDESTRIAN BRIDGE OVER THE STREAM (7) STORMWATER DRAINAGE SYSTEM, INCLUDING AN OIL/PETROL INTERCEPTOR (8) DECOMMISSIONING OF 2NO. EXISTING SEPTIC TANKS (9) ALL ASSOCIATED SITE WORKSDecision record indexed
TULLAGHCULLION & CASHELREAGH GLEBE, KILLYBEGS, DONEGAL PO
CONSTRUCTION OF EXTENSIONS TO EXISTING NET MAKING BUILDING TO PROVIDE ADDITIONAL MANUFACTURING AND STORAGE FACILITIES AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE / STORE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF 4NO. WHEELCHAIR ACCESSIBLE GLAMPING PODS, INSTALLATION OF PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED WORKS AND SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONGrounds not yet categorised