For the installation of an ATM machine to the front elevation of the existing shop premises
Of a coffee trailer and seating area along with associated site works and services
To RETAIN existing conservatory and rear storage area
For the change of use of a vacant classroom into a full daycare facility
For development which will consist of a dwelling house and garage with a proprietary wastewater treatment system and polishing filter together with ancillary works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
(i) to RETAIN garage as constructed in variance to that granted under Planning Reg. Ref. P99-1362, (ii) PERMISSION to demolish same garage and (iii) PERMISSION to construct new extension to dwelling house and ancillary works
The development will consist of proposed alterations and extension to existing dwelling to include (A) Demolition of existing single structure to rear of dwelling, (B) Minor alterations to retained original dwelling structure, (C) Construction of new side and rear extension to original dwelling, (D) Decommissioning of existing septic tank and proposed connection to public sewer system, (E) Alterations to existing vehicular entrance and boundary treatments, along with all associated and ancillary site development works
For development on this site which consists of: planning PERMISSION sought for (A) The partial demolition of the existing single storey dwelling structure, with proposed extension and alteration works to provide a modified two storey dormer dwelling. RETENTION permission sought for: (A) Rear detached garage structure to be incorporated into the modified two storey dormer dwelling as dwelling use. (B) Minor modifications carried out to the Killard Road vehicular entrance positioning and boundary wall treatment granted under planning permission Ref: P21/1257, along with all ancillary site development works
To demolish & rebuild the hayshed & permission to RETAIN the machinery shed and all associated site and ancillary works
For the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To erect dwelling house, garage, waste water treatment system, new site entrance and all associated works
To construct a side extension to the existing dwelling house along with all associated site works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
To demolish existing farm shed and for permission to erect slatted tank, cattle farm shed and silage slab
To extend existing dwelling house, install foul sewerage treatment plant and percolation area
Of the demolition and reconstruction of the remainder of the dwelling house that was proposed to be refurbished and extended under P24-60404, removal of old foundations and installation of new substructure to facilitate the design granted under P24-60404 along with all associated works
Is sought for an extension to an existing bungalow dwelling at Killard, Doonbeg, Co. Clare, V15KR90, on behalf of Jimmy and Rebecca Kirby of Red Phalarope Investment Holdings Ltd. The proposed works include the demolition of the existing stand-alone garage and removal of the porch, bay window and chimney; raising the roof to accommodate a mezzanine level; provision of a new chimney; and providing an external terrace and stair at this level, including a north-facing dormer. The proposed works include a single-storey block (with roof-lights) to the south, containing 4 no. En-Suite bedrooms; an external terrace; a Guest WC, and a Plant Room. External works include relocation of the driveway entrance on Killard Road, associated landscaping, planters, drainage works and miscellaneous other works
To construct dwelling house, garage, carport with loft, treatment system and provide new entrance to public road
Proposes to carry out the following development. The construction of a new housing estate development consisting of: a) 8 no. residential units comprising of: 2 No. 3-bedroom, two-storey semi-detached dwellings; 3 No. 2-bedroom, two-storey semi-detached dwellings; 3 No. 2-bedroom single storey semi-detached dwellings; b) 13 ancillary car parking spaces within the development. c) The construction of vehicular and pedestrian access points to the site from Dun Na Mara housing estate. d) Alterations to ground levels to accommodate the development. e) Varied boundary treatments and landscaping works. f) Surface water management will include hydrocarbon interceptor. g) Footpath to N67 and link to village. h) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
For (a) to construct extensions to the front, side and rear of the existing dwelling house; (b) to make elevational alterations to the existing house; (c) to construct a standalone storage outbuilding ancillary to the dwelling house; (d) to construct a garden room ancillary to the dwelling house; (e) to make alterations to the existing private shed; and (f) all associated site works and services.
For the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
For a Proposed Serviced Caravan/ Motorhome Park consisting of set down bays for 37 static Mobile Homes, 19 Motorhomes, Open Space Area, Facilities Building, Bin store/ Recycling Compound, relocate the existing entrance addition 51 no. on-site car parking spaces Bed and Breakfast Building and all associated ancillary site works
To construct a new dwelling house and private garage with connection to main sewer and water services with all necessary ancillary works
Of the following: A/as constructed rear extension to existing dwelling, Planning Ref P8-6465 applicable. B/ as constructed domestic shed, Planning Ref P8-4170 applicable. C/ gable porch/sunroom plus all ancillary site works
To demolish an existing substandard house and to construct a new house and a new garage and to refurbish an existing outbuilding for home office use and all associated site works
To construct a new dwelling house, private shed, site entrance, wastewater treatment system and all associated site works and services
Of the following a) extension to side of dwelling house, b) velux rooflights to dwelling house and c) detached private garage to side of dwelling house along with associated site works
Of existing private storage shed
For development which will consist of (1) the demolition of an existing substandard dwelling house and stores (2) The construction of a new single storey dwelling house with a proprietary wastewater treatment system and ancillary site works
Of the rear extension to the rear of the existing dwelling house, along with all associated site works
To renovate and extend existing dwelling house, to demolish existing rear porch and to include the provision of a new sewage treatment system and decommissioning of existing septic tank with all necessary ancillary works
Of (a) extension to existing dwelling house (b) private garage / store (c) new entrance to existing dwelling house
To construct a new dwelling house, access road, entrance, private garage, connection to existing public sewerage & water services along with all associated works
For a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi. Upgrade of access junctions; vii. Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix. 2 no. temporary construction compounds; x. Site drainage; xi. Forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
For a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. Permanent extension to the 110kV substation at Knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kV bay and security fencing; 6. Upgrade of access junctions; 7. Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8. 2 no. borrow pits; 9. 2 no. temporary construction compounds; 10. Site Drainage; 11. Forestry Felling; 12. Operational stage site signage; and 13. All associated site development ancillary works and apparatus. The Proposed Development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
For the development which will consist of a dwelling house and garage with proprietary wastewater treatment system and percolation area together with ancillary site works
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system and all associated site works and services.
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
Of the domestic garage together with all associated site development works, boundaries and services
To construct extension to gable / rear of existing dwelling house, plus all ancillary site works
To RETAIN the existing dwelling as constructed together with rear extension and retention of part use of existing dwelling for short term tourism accommodation and for PERMISSION to construct a garage/fuel shed along with ancillary works
To construct a garage/fuel shed along with ancillary works
To construct a new dwelling house with private garage, site entrance, on-site wastewater treatment system and all other associated site works
To construct a dwelling house, garage with a waste water treatment system and percolation area
Of the following; a) the alterations to the existing dwelling house b) the garage/shed as constructed along with associated site works
To construct a granny flat to the side of an existing dwelling house along with all associated works
For change of use of existing ground floor storage area to office space with all necessary ancillary works at their headquarters
To construct an extension to the west side of an existing dwelling house and alterations to the front porch including widening the front door and removing side windows, along with ancillary works