The development will consist of: the construction of a single-storey outbuilding in the rear garden, with a footprint of 35 sq.m, for use as a home office and amenity space.
The provision of a new external ramp to enhance emergency escape provisions from the existing nursing home to a place of safety, the removal of two car parking spaces to the north west of the site, the relocation of an existing waste water access chamber and the installation of new external lighting to service the ramp and all associated site works.
Internal alterations only which are: at level 2 (ground floor), change existing stairs into storage room and new open reception area change existing reception area into an enclosed office, change 2 existing offices into 2 new bedrooms, provide a nurses station in the physio room and change the existing nurses station into a bedroom. At level 3 (first floor plan) change the existing stairs into a hoist and wheelchair storage room, change an existing 4 bedroom unit into 2 new 2-bed units, change an existing nurses station into a bedroom, change an existing wheelchair storage room into a bedroom. There are no changes proposed to the exterior of the building.
Planning permission sought by Julian Egidiu & Ana Mihoc for 2/3 storey house (3 bedrooms + attic study room) rear dormer & 2 Velux windows, associated works, set back from existing house in line with existing houses at GREENE HAVEN ESKER ROAD LUCAN. CO. DUBLIN K78 XE28.
Two storey extension to rear and velux to front existing house & all associated works.
Retention permission for development consisting of the following changes to the design as approved under planning register reference number SD15A/0084/ PL06S.245493 (extended under planning reference number: SD15A/0084/EP); a) the omission of chimneys b) revised canopy detail above front entrance doors c) the widening of houses 1 & 2 resulting in site layout changes d) revised levels and landscape details / boundary treatments e) changes to the positioning of the window and door in the rear utility room of all houses f) changes to the size and number of Velux windows to the rear roof of all houses and g) changing the rear window of the kitchen / dining room to a door and widening the opening of all houses at 'The Bungalow', Hayden's Lane, Adamstown, Lucan.
Demolition of an existing single storey house and garage (145.30sq.m) and the erection of 6 no. 2 storey houses with converted attics (140sq.m each) in 2 terraced blocks of 3 houses, with dormer windows to the front, 'Velux' windows to the rear and associated site development and drainage works including a new vehicular access for each house fronting onto the public roadway and new front boundary wall and brick piers.
The retention of a single-storey outbuilding in the rear garden, with a footprint of 35 sq.m, for use as a home office and amenity space.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear
Extend the capacity of pre-school service from previous permission allocation of 13 children, to two classes of 15 children each, in the form of a morning (8.30am to 11.30am) and an afternoon (12.00pm to 3.00pm) session.
(a) A change of roof profile from hip end profile to Dutch Hip profile to accommodate attic conversion with dormer extension to rear (b) 1 No Velux roof light to front (c) All associated site works
Single storey extension to rear and side including garage conversion
Single storey extension to the left hand side; extension to the front at ground and first floor level in order to straighten the front building line; addition of a two storey extension to the front which will act as a porch at ground floor level and a bathroom at first floor level; to face the central portion of the front elevation in natural stone over its full height; extend the existing garage on the right hand side to the front and rear; remove the existing garage roof and build a first floor extension over the entire extended garage area; existing ground floor area including the garage is 152.38 sq.m & the proposed ground floor extensions will add 101.05 sq.m.; the existing first floor are is 68.95sq.m. & the proposed first floor extension will add 115.59sq.m.; all ancillary site works required to complete the project.
Construction of a residential development comprising 3 three to five storey blocks of 74 apartments (20 one bed, 48 two bed and 6 three bed) all with associated private balconies/terraces to the north/south/east/west elevations; vehicular and pedestrian access from Hayden's Lane to the north west of the site and closure of the second existing vehicular entrance at south west of site; pedestrian access from Griffeen Park to the south east of the site; provision of car and cycle parking, public and communal spaces, bin stores and all associated site development and clearance works, landscaping, boundary treatments and other servicing works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Demolition of existing utility room at side for subdivision of the site and construction of a two storey, four bedroom detached dwelling house with dormer at rear, to include alterations to existing front boundary on Ardeevin Avenue for creation of 1 additional vehicular access gate plus relocation of existing vehicular access gate. Proposals include for all associated site works, including drainage, hard landscaping and site development works.
Alterations to existing dwelling to include demolition of existing single storey garage; single storey rear extension and garden shed; removal of first floor dormer and chimney; new external insulation; new windows and roof windows; new dormer to the west; construction of new two storey extension to the east and a single storey extension to the rear of the site; overall increase of the floor area will be 86.55sq.m; all associated site works.
Planning permission is sought for attic conversion, raising of gable wall to change roof profile with projecting dormer to rear roof, new playroom, also 2 new Velux windows to front roof and all associated site works
Planning Permission for 1) Conversion of existing attic non-habitable storage use. 2) Provision of dormer to the rear roof plane. 3) Ground floor front extension to the front and all associated site works.
Amendment to SDCC Reg. Ref. SD20A/0279 to amend the floor area of the permitted single storey dwelling house and associated site development works above and below ground. The amended scheme will result in: the reduction of floorspace from 279.8 sq.m to 208 sq.m; internal reconfiguration; associated elevational amendments; and hard and soft landscaping amendments.
Construction of a single storey, three bedroom dwelling house (279.8sq.m); repositioned entrance and upgraded access road from Tay Lane which includes the partial demolition (109sq.m) of the existing stables and closing up of the existing entrance, hard & soft landscaping; boundary treatments; all associated site development works above and below ground.
Construction of a single storey three bedroom dwelling house (279.8sq.m); repositioned entrance and upgraded access road from Tay Lane which includes the partial demolition (109sq.m) of the existing stables and closing up of the existing entrance; hard and soft landscaping; boundary treatments and all associated site development works above and below ground.
Change of use of 148sq.m of warehouse floor area to ancillary use as research & development room and warehouse & logistics station, including internal fire escape stairs; provision of 137sq.m of additional ancillary conference/presentation room at the first floor directly over the area defined in item above. The above alterations result in 137sq.m of new floor area thus increasing the building area from 2683sq.m to 2820sq.m. The works are fully internal therefore no elevation changes or other external alterations are required. All other details remain as per granted planning applications Reg. ref SD07A/0171, SD07A/0993 and SD17A/0358.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
Charles River Microbial Solutions International Limited intend to apply to South Dublin County Council for retention permission at unit no. 648, Jordanstown Drive, Greenogue Business Park, Rathcoole, Co Dublin. The retention permission consists of: Retention of minor alterations to elevations associated with changes to the window on the First Floor Level. Retention of an increase in Floor Area of the External Cold Store/freezer compound with an associated increase of size to the Cold Store and the Freezer Units, and all associated works.
Retention permission consists of 1. Retention of existing mezzanine floor at first floor level within unit 648 totalling 453 sqm. 2. Retention of additional car parking spaces within the site, some of which are utilised to serve the adjacent unit 649. 3. Retention of existing pedestrian access point between units 648 and 649. Permission is sought for 1. Change of use of unit 648 from waste metal transfer facility to provide for use of the building as a pharmaceutical warehousing building with provisions for storage, offices, laboratories and staff facilities. 2. Reconfiguration of existing offices and all associated elevational changes proposed. 3. Provision of a bicycle shelter along with an external freezer building, external cold store building, bin compound building, air handling unit and heat rejection plant. 4. Provision of an additional 18 no. car spaces for unit 648. 5. Provisions of all associated and ancillary site works. 6. Provision of new pedestrian entrance. 7. Connection to existing services. 8. Provision of associated signage.
Construction of a 60.5sq.m single storey extension to the front, side and rear of existing dwelling and construction of rear and side dormers to existing roof to accommodate attic storage area.
Demolition of an existing utility room to the west/rear and the construction of a new single storey flat roof extension to the west/rear of the property comprising of new dining and living spaces along with all associated ancillary drainage, landscaping and site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and 2no. roof windows to the front
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from hipped roof to gable end roof) to side/rear, 2 roof lights to front elevation, 2 rooflights to rear roof elevation, ground floor extension to rear, new porch area to front with internal modification and associated site works.
Alterations to Unit 601 including a replacement of originally proposed 6 dock leveller & 2 level access doors with 4 dock levellers & 11 van docks to building's southern (rear) elevation; relocation of the 74sq.m. internal warehouse staff facility block from the rear south-west corner of the warehouse to the side (west) elevation including the rearrangement of fire door from rear to the western (side) elevation; this alteration doesn't affect the overall building areas as per previously granted application; addition of water holding tank 95sq.m., 7.95m high) and associated pump house to the north-west corner of site 605 serving both sites, 601 & 605; associated site levels & drainage layout adjustments due to the above alterations; all other details remain as per granted application Ref. SD19A/0171 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tanks design, foul sewer, drainage and outfalls.
The amalgamation of two existing industrial buildings (Unit 502B and Unit 502C), including ancillary offices, comprising 1,860 sq.m and 1,929 sq.m respectively, to form a single industrial building comprising 3,789. sq.m, including ancillary offices and b) all associated site works.
Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from hipped to gable end) to side/rear, 2 rooflights to front elevation, 2 rooflights to rear roof elevation, internal modification and associated site works.
612sq.m of warehouse space and 46sq.m of ancillary office.
Change of use from doctors surgery to residential dwelling; all associated site works.
(A Protected Structure, South Dublin County Council RPS No. 094). The development consists of the following: The removal of the existing 52 No. car parking spaces for the construction of a 3-storey terraced residential development with a total of 8-unit apartments, which will consist of 4 No. 3-bed apartments at ground floor level and 4 No. 4-bed duplex apartments on the upper floors. All with associated private open space, bike storage, bin storage, car parking, communal open space, and other necessary site works.
Removal of selected hedging, the removal of the existing 52 car parking spaces and the construction of a 4-storey apartment building with setbacks at third floor level, total 14 apartments comprising of 1 one-bedroom, 11 two bedroom; 2 three bedroom apartments, all with associated private open spaces areas in the form of balconies; access to the development from existing vehicular and pedestrian entrance from Leixlip Road (R835) and from proposed new vehicular and pedestrian access from Ardeevin Drive; all with associated landscaped courtyard at ground floor level, sedum roof (main roof), bicycle storage, bin storage, signage, associated drainage and site development works (Protected Structure RPS No. 094).
Planning permission at a site of 0.177 ha at the Ball Alley House, (A Protected Structure, South Dublin County Council RPS No. 094). The development consists of the following: the removal of the existing car parking spaces for the construction of three new houses: 1 no. 4-bed detached house and 2 no. 3 -bed semi-detached houses. The vehicular and pedestrian entrance is accessed by an existing road connected to Leixlip road R835. The development will also include all landscaping, and site associated works at Ball Alley House, Leixlip Road, Lucan, Co. Dublin.
A) the Sub-division of the existing single industrial building, including ancillary offices, comprising 3,789 sq.m to form two separate self-contained industrial buildings, including ancillary offices, comprising 1,860 sq.m and 1,929 sq.m and b) all associated site works.
Retention of development comprising 638sqm extension to existing warehouse with canopy to front and 68sqm of portable ancillary office Space
Attic conversion to storage space to include main hipped roof design changed to a continuous A lined roof with a block gable on right side elevation (north east elevation) to include a new window on second floor in proposed new gable wall and three roof lights on the rear elevation.
Electric Vehicle Charging Station consisting of 5 EV charging stations, each serving 2 vehicle charging bays, a total of 10 charging points, 2 x 4 bay canopy structures incorporate circa. 84sq.m of roof mounted solar panels; The proposed development also incorporates 1 ESB substation, the use of an existing point of access / egress and all associated above and below ground ancillary works.
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Retention is sought for: (i) a 448 sq.m concrete yard and (ii) an agricultural access onto Clonee Road. Permission is sought for: (i) the provision for a 448 sq.m synthetic grass playing area atop the concrete yard to provide residential amenity to Ounavarra House; (ii) alterations to existing unauthorised agricultural access (7.173 m in width) to provide a reduced entrance width of 3.6 m; the proposed works include the (a) demolition of 2 no. internal entrance piers, (b) the partial demolition of the stone wall and to facilitate the reduced width, (c) provision of timber posts and timber fence, (d) the existing external stone entrance piers are proposed to be reduced height; (iii) all associated landscaping, boundary treatments, site and engineering works necessary to facilitate the development.
Killross Properties Limited, intend to apply for permission for a residential development of 97 dwellings (consisting of 45 no. houses, 48 no. apartments and 4 no. duplexes), the demolition of 7 no. structures including 3 no. habitable dwellings, a 293.1 sq.m creche facility and all ancillary development, on a 2.17 ha site to the north of the N4 Lucan by-pass and to the east of Ardeevin Manor and Ardeevin Court, (Lucan and Pettycanon townlands), Lucan, County Dublin. Vehicular access is proposed from Ardeevin Avenue, Ardeevin Manor to the west, and cyclist and pedestrian access is proposed from Primrose Lane to the northThe proposed development comprises: 1. The Demolition of 7 no. existing structures on site including storage units, a community building and 3 no. habitable dwellings (999.92 sq.m)2. The Construction of 97 no. residential dwelling comprising:o 2 no. 1 bedroom apartments;o 46 no. 2 bedroom apartments; o 2 no. 2 bedroom duplex units; o 2 no. 3 bedroom duplex units; o 44 no. 4 bedroom semi-detached houses; and o 1 no. 4 Bedroom Detached House. 3. The Construction of a 293.1 sq.m childcare facility; 4. 4,039 sq.m of Public Open Space provided in 7 separate landscaped areas.5. The extension of Ardeevin Avenue facilitate vehicular access to the site. 6. Connection to Primrose Lane to facilitate cyclist and pedestrian access. 7. 101 no. car parking spaces, 125 no. bicycle spaces; 8. All enabling and ancillary development and works including landscaping, boundary treatments, lighting, water and utility services and connections, waste management and all ancillary development and works above and below ground.