The development seeking permission will consist of the construction of a dormer window in the main roof to the rear of the property as well as the construction of two rooflights in the main roof to the front of the property and all associated site works.
Extension and refurbishment of existing dwelling to include construction of two storey extension to side and rear; internal alterations to existing layout; alterations to front, side and rear elevations including canopy area and roof to existing dwelling; alterations to side boundary; maintenance works and all associated site works.
Proposed dormer roof window on rear slope of roof at attic level
Planning permission is sought for retention of single storey building to rear garden for home office / playroom use and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 3no. roof windows to the front and flat roof dormer to the rear.
Retention permission for; 1) Conversion of existing attic space comprising of modification to existing roof structure, new access stairs, 4no roof windows to the rear. 2) Single storey extension with 2no. roof windows to the rear of existing dwelling. and Planning permission for; 1) Single storey extension with 2no roof windows to the rear of existing dwelling and all associated site works.
Two storey extension (floor area 199sq.m) containing 1 classroom at ground floor level; 1 classroom and an assisted shower room at first floor level to the rear of existing two storey school building (floor area 2,767sq.m); new roof window to existing roof surface of adjacent stairwell, together with all associated site works.
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.
A small increase in area of front entrance porch and new pitched roof to replace existing flat roof over proposed enlarged front entrance porch and adjoining front room projection at ground floor level including the widening of existing vehicle entrance to front of site and associated site works.
The demolition of an existing side extension and construction of a single storey side extension to accommodate bedroom and en-suite, a first floor dormer extension including master bedroom suite, home office and TV room, pergola structure to side and front, a new 1800 mm high blockwork wall to road boundary and associated site works, all to existing single storey bungalow. AI received 22/12/22
(1) Demolition of existing single and two storey post primary school buildings (1050sq.m) to the east of the main school buildings. (2) Construction of a part two, part three storey post primary school extension (3346sq.m in total) configured as follows; (a) three storey extension (1817sq.m) north of main school building along the Lucan Road forming a new post primary school pedestrian entrance off the Lucan Road, (b) two storey extension (1340sq.m) to the east of main school buildings, (c) two storey extension (escape stairs 55sq.m) to the south of main school buildings on the west side of the two storey classroom block, (d) single storey extension (133sq.m) at first floor north of the existing PE hall. (3) Reconfiguration of the existing vehicular and pedestrian access off Lucan Heights to form the main post primary school vehicular entrance and secondary pedestrian entrance. (4) The reconfiguration of the existing primary school pedestrian entrance in its current location off the Lucan Road and the re-designation of the existing post primary school vehicular entrance as the primary school vehicular entrance. (5) All associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, 2no. roof windows to the front, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w 'Dutch' hip and window; new access stairs and flat dormer to the rear.
The development will consist of the provision of a front facing dormer window into existing attic story in the approximate location of existing former window.
Construction of single storey extension to the side of existing dwelling comprising of family room, bedroom with en-suite and all associated site works. Pedestrian access from Griffen Dene.
Construction of single storey extension to the side of existing dwelling comprising of family room and bedroom with en-suite and all associated site works.
The development will consist of construction to extend the existing house at the rear/ North, loft conversion, widen the vehicular entrance and all associated site development works.
A garage conversion and a first floor extension over the converted garage as built in 1974, with a proposal to remove the overhanging facia, guttering and soffit and replace with a parapet wall and capping.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear
Permission for retention for a change of Roof Profile to the existing front porch extension from pitched to flat roof, and for an additional ground floor window to the gable (side) elevation
Construction of a new two storey extension to the side of the existing dwelling which will incorporate a garage and office at ground floor level and two bedrooms at first floor level.
Retention of alterations to previously granted permission, Ref. SD19B/0105, consisting of an additional two storey bay window to front of house; additional two storey extension to the rear of the house allowing for larger kitchen and bedroom and all associated site works.
Single storey extension to front; Two storey extension to side; New pedestrian access to rear from side and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land adjoining the car park within the grounds of Scoil Mhuire Girls' National School, Lucan Road, Lucan, Co. Dublin
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and dutch hip; new access stairs; 2 roof windows to the front and flat roof dormer to the rear.
The development will consist of: Construction of a new louvered screen with access door to the front and side at ground floor level to screen a bin storage area behind, and the construction of a single storey flat-roof extension to the rear.
The removal of a canopy and the construction of a 4 sq.m porch to the front of this existing detached house and all associated works necessary to facilitate the development.
Erection of two storey dwelling which would contain a floorspace of 118.3sq.m on a strip of land which is located to the side and would provide a combined kitchen / dining room, a sitting room and four bedrooms, along with ancillary bathroom, storage, utility and hallway / corridor accommodation; The application also entails the provision of a rear garden, two parking spaces in the front part of the site and all site works including connections to the public mains water supply, storm water sewer and foul effluent sewer and boundary treatment, along with all ancillary site works.
(a) Demolition of existing boiler shed to rear; (b) construction of new single storey pitched roof extension to rear; (c) construction of new first floor side extension with extended hip roof over existing side extension; (d) installation of solar PV panels to front pitched roof; (e) internal alterations to floor layouts; (f) all associated site works.
Conversion of attic space comprising of modification of existing roof structure; raising of existing gable c/w window and 'Dutch' hip; new access stairs and flat dormer to the rear.
Elevational modifications to include new roof windows to the front elevational and all associated site development works.
Demolition of existing two storey detached dwelling house and outbuildings; Construct new purpose built three storey mixed used building with, a new physiotherapy practice, consisting of 5 consultation rooms, office space, staff areas as well as a rehab gym and studio area, all over two floors at ground and first floor levels; One bedroom apartment with own door access and dedicated private balcony area at the second floor level; 5 car parking spaces and secure bicycle parking for 6 bicycles all on site; Back lit signage to the front facade of the building; All associated site development works.
Two storey side Extension with pitched roof over with partial ground floor rear extension with pitched roof & 1No. Roof light
The construction of a connecting passageway between the existing house and garage, the partial conversion of the existing garage, and the non-construction of parts of the design granted permission under planning Ref. SD02B/0490.
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
Two storey side extension consisting of ground floor car garage and store with first floor ensuite bedroom.
An attic conversion with dormer window to rear and associated site works.
Retention for pitched roof structure over side passageway.
Conversion of attic space to storage space in existing 2 storey semi-detached house. Erection of dormer window to the rear elevation, 3 roof lights to front elevation. Gable Dutch hip to be replaced with standard A roof design. Internally a new-stairs to the 2nd floor and the alteration of 1st floor to accommodate new floor plan layout with minor alteration to fenestration and all ancillary site works. Maintain connection to existing county council soil and surface water.
Construction of 2 adjoined single storey data centres with associated office and service areas with an overall gross floor area of 15,274sq.m comprising of the construction of 2 adjoined single storey data centres with a gross floor area of 12,859sq.m that will include a single storey goods receiving area / store and single storey office area (2,415sq.m) with PV panels above, located to the east of the data centres as well as associated water tower, sprinkler tank, pump house and other services; The data centres will also include plant at roof level; with 24 standby diesel generators with associated flues (each 25m high) that will be located within a generator yard to the west of the data centres; New internal access road and security gates to serve the proposed development that will provide access to 36 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; New attenuation ponds to the north of the proposed data centres; Green walls are proposed to the south and east that will enclose the water tower and pump house compound; The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage; The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and Ref. SD21A/0042; The site will remain enclosed by landscaping to all boundaries; The development will be accessed off the R120 via the permitted access granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and SD21A/0042; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Attic conversion with dormer window to the side hip, for access stairs, some internal alteration, exempt single storey extension to the rear, garage conversion, widening existing vehicular access, installing electric sliding gate, some internal alterations, associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land within the car park.
Change of roof profile from hip end profile to Dutch hip end profile to accommodate attic conversion with dormer extension to rear, Single storey extension to rear, Garage conversion and porch extension to front, Single storey domestic shed / workshop to rear, New window to gable / shed, Widening of existing vehicular access gates to front. All associated site works
The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 - 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development
Retention and completion of amendments to the permitted internal road layout, internal fencing and other ancillary internal layout amendments that were permitted under SDCC Planning Ref. SD18A/0298.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and installation of 2no. roof windows to the front